| एपीआई 5एल/एएसटीएम ए53 जीआर.बी, कार्बन स्टील, एसएसएडब्ल्यू स्टील पाइप | |||||||||||||
| EXW तियानजिन अमरीकी डालर/टन | बाहरी व्यास माप (मिमी) | ||||||||||||
| 219 | 273 | 324 | 356 | 406 | 457 | 508 | 610 | 711 | 762 | 813 | 914 | ||
| दीवार की मोटाई | 6 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 |
| लंबाई (मिमी) | 7 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 |
| 8 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 9 | / | / | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 10 | / | / | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 11 | / | / | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 12 | / | / | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 13 | / | / | / | / | / | / | / | $575.55 | $580.79 | $580.79 | $580.79 | $580.79 | |
| 14 | / | / | / | / | / | / | / | $575.55 | $580.79 | $580.79 | $580.79 | $580.79 | |
| 15 | / | / | / | / | / | / | / | / | / | / | / | $591.28 | |
| 16 | / | / | / | / | / | / | / | / | / | / | / | $591.28 | |
| 17 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 18 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 19 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 20 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 22 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 24 | / | / | / | / | / | / | / | / | / | / | / | / | |
| EXW तियानजिन अमरीकी डालर/टन | बाहरी व्यास माप (मिमी) | ||||||||||||
| 1016 | 1067 | 1118 | 1168 | 1219 | 1321 | 1422 | 1524 | 1626 | 1727 | 1829 | 1930 | ||
| दीवार की मोटाई | 6 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | / | / | / | / | / |
| लंबाई (मिमी) | 7 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | / | / | / |
| 8 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | / | / | / | |
| 9 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | / | / | / | |
| 10 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | / | / | / | |
| 11 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | $587.35 | $593.90 | $593.90 | |
| 12 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | $587.35 | $593.90 | $593.90 | |
| 13 | $580.79 | $593.90 | $593.90 | $593.90 | $593.90 | $593.90 | $593.90 | $597.84 | $597.84 | $597.84 | $597.84 | $617.50 | |
| 14 | $580.79 | $593.90 | $593.90 | $593.90 | $593.90 | $593.90 | $593.90 | $597.84 | $597.84 | $597.84 | $597.84 | $617.50 | |
| 15 | $591.28 | $604.39 | $604.39 | $604.39 | $604.39 | $604.39 | $604.39 | $610.95 | $610.95 | $610.95 | $610.95 | $630.61 | |
| 16 | $591.28 | $604.39 | $604.39 | $604.39 | $604.39 | $604.39 | $604.39 | $610.95 | $610.95 | $610.95 | $610.95 | $630.61 | |
| 17 | / | / | / | / | $604.39 | $604.39 | $604.39 | $617.50 | $617.50 | $656.83 | $656.83 | $656.83 | |
| 18 | / | / | / | / | $604.39 | $604.39 | $604.39 | $617.50 | $617.50 | $656.83 | $656.83 | $656.83 | |
| 19 | / | / | / | / | / | / | / | / | / | / | $656.83 | $656.83 | |
| 20 | / | / | / | / | / | / | / | / | / | / | $656.83 | $656.83 | |
| 22 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 24 | / | / | / | / | / | / | / | / | / | / | / | / | |
| टिप्पणी: | |||||||||||||
| 1. उपरोक्त कीमत नंगे पाइप पर आधारित है, अतिरिक्त कोटिंग के लिए कृपया हमसे संपर्क करें; | |||||||||||||
| 2. उपरोक्त कीमत EXW पर आधारित है, एफओबी/सीआईएफ/सीएफआर कीमत के लिए, कृपया हमसे संपर्क करें; | |||||||||||||
| 3. विस्तृत उद्धरण के लिए उपरोक्त कीमत में कोई पैकिंग और अंतिम प्रसंस्करण शुल्क शामिल नहीं है; | |||||||||||||
| 4. उपरोक्त कीमत केवल 2 अक्टूबर तक वैध है; | |||||||||||||
| 5. इस मूल्य सूची के लिए लागू MOQ 25 टन से अधिक है; | |||||||||||||
पोस्ट करने का समय: सितम्बर-25-2020