| एपीआई 5एल/एएसटीएम ए53 जीआर.बी, कार्बन स्टील, एसएसएडब्ल्यू स्टील पाइप | |||||||||||||
| EXW तियानजिन अमरीकी डालर/टन | बाहरी व्यास माप (मिमी) | ||||||||||||
| 219 | 273 | 324 | 356 | 406 | 457 | 508 | 610 | 711 | 762 | 813 | 914 | ||
| दीवार की मोटाई | 6 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 |
| लंबाई (मिमी) | 7 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 |
| 8 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | |
| 9 | / | / | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | |
| 10 | / | / | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | |
| 11 | / | / | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | |
| 12 | / | / | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | |
| 13 | / | / | / | / | / | / | / | $616.09 | $621.50 | $621.50 | $621.50 | $621.50 | |
| 14 | / | / | / | / | / | / | / | $616.09 | $621.50 | $621.50 | $621.50 | $621.50 | |
| 15 | / | / | / | / | / | / | / | / | / | / | / | $632.30 | |
| 16 | / | / | / | / | / | / | / | / | / | / | / | $632.30 | |
| 17 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 18 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 19 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 20 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 22 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 24 | / | / | / | / | / | / | / | / | / | / | / | / | |
| EXW तियानजिन अमरीकी डालर/टन | बाहरी व्यास माप (मिमी) | ||||||||||||
| 1016 | 1067 | 1118 | 1168 | 1219 | 1321 | 1422 | 1524 | 1626 | 1727 | 1829 | 1930 | ||
| दीवार की मोटाई | 6 | $607.98 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | / | / | / | / | / |
| लंबाई (मिमी) | 7 | $607.98 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $628.25 | $628.25 | / | / | / |
| 8 | $607.98 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $628.25 | $628.25 | / | / | / | |
| 9 | $607.98 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $628.25 | $628.25 | / | / | / | |
| 10 | $607.98 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $628.25 | $628.25 | / | / | / | |
| 11 | $607.98 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $628.25 | $628.25 | $628.25 | $635.01 | $635.01 | |
| 12 | $607.98 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $628.25 | $628.25 | $628.25 | $635.01 | $635.01 | |
| 13 | $621.50 | $635.01 | $635.01 | $635.01 | $635.01 | $635.01 | $635.01 | $639.06 | $639.06 | $639.06 | $639.06 | $659.33 | |
| 14 | $621.50 | $635.01 | $635.01 | $635.01 | $635.01 | $635.01 | $635.01 | $639.06 | $639.06 | $639.06 | $639.06 | $659.33 | |
| 15 | $632.30 | $645.82 | $645.82 | $645.82 | $645.82 | $645.82 | $645.82 | $652.57 | $652.57 | $652.57 | $652.57 | $672.84 | |
| 16 | $632.30 | $645.82 | $645.82 | $645.82 | $645.82 | $645.82 | $645.82 | $652.57 | $652.57 | $652.57 | $652.57 | $672.84 | |
| 17 | / | / | / | / | $645.82 | $645.82 | $645.82 | $659.33 | $659.33 | $699.86 | $699.86 | $699.86 | |
| 18 | / | / | / | / | $645.82 | $645.82 | $645.82 | $659.33 | $659.33 | $699.86 | $699.86 | $699.86 | |
| 19 | / | / | / | / | / | / | / | / | / | / | $699.86 | $699.86 | |
| 20 | / | / | / | / | / | / | / | / | / | / | $699.86 | $699.86 | |
| 22 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 24 | / | / | / | / | / | / | / | / | / | / | / | / | |
| टिप्पणी: | |||||||||||||
| 1. उपरोक्त कीमत नंगे पाइप पर आधारित है, अतिरिक्त कोटिंग के लिए कृपया हमें बताएं; | |||||||||||||
| 2. उपरोक्त कीमत EXW पर आधारित है, एफओबी/सीआईएफ/सीएफआर कीमत के लिए, कृपया हमें बताएं; | |||||||||||||
| 3. विस्तृत उद्धरण के लिए उपरोक्त कीमत में कोई पैकिंग और अंतिम प्रसंस्करण शुल्क शामिल नहीं है; | |||||||||||||
| 4. उपरोक्त कीमत केवल 1 दिसंबर तक वैध है; | |||||||||||||
| 5. इस मूल्य सूची के लिए लागू MOQ 25 टन से अधिक है; | |||||||||||||
पोस्ट करने का समय: नवंबर-26-2020