Spiral steel pipe accumulation requirements 1. The standard requirement for spiral steel pipe stacking is to stack according to types and standards under the premise of stacking peace and safety. Different types of materials should be stacked separately to avoid muddling and mutual corrosion; 2. Prevent items that are corrosive to steel from being stored around the spiral steel pipe stack; 3. The bottom of the spiral steel pipe stack should be raised, consolidated and flat to avoid moisture or deformation of the material; 4. The same materials are stacked according to the order of storage; 5. Spiral steel pipe sections stacked in the open must have wooden mats or slabs underneath, and the stacking surface should be slightly inclined to facilitate drainage and pay attention to the material to be placed straight to avoid bending and deformation; 6. The stacking height of spiral steel pipes does not exceed 1.2m for manual work, 1.5m for mechanical work, and 2.5m for stack width; 7. There should be a certain passage between the stack and the stack, the inspection channel is generally 0.5m, and the income and expenditure channel depends on the size of the material and the conveying machinery, generally 1.5~2.0m; 8. The open-air piled angle steel and channel steel should be laid down, that is, the mouth should be facing down, the I-beam should be placed upright, and the I-slot surface of the steel should not be facing upwards to avoid rusting due to accumulated water; 9. Elevation of the bottom of the stack. If the warehouse is on a sunny cement floor, the elevation can be 0.1m; if it is a muddy floor, the elevation must be 0.2~0.5m. If it is an open field, the height of the cement floor is 0.3~0.5m, and the height of the sand and mud surface is 0.5~0.7m. Post time: Nov-02-2023

Latest news list

  • steel pipe fitting thermal expansion and vibration,steel elbow vibration,piping thermal movement,steel tee stress
    Steel tees,reducers and elbows operate as part of a connected piping system,When temperatures change or equipment generates vibration,loads can develop at fittings,joints,supports and equipment connections,If these effects are not properly addressed,the system may experience excessive movement,leakage or fatigue-related damage,Managing thermal expansion and vibration requires more than inspecting an individual fitting,Engineers need to consider the piping layout,operating conditions,support arrangement and the behavior of the complete system,
  • how to choose a steel tee,steel tee selection,steel tee buying guide,equal tee vs reducing tee,steel tee procurement
    Selecting a steel tee for an industrial piping project involves more than matching pipe sizes,The fitting must meet the piping layout,material specification,connection requirements and operating conditions,An incorrect specification can lead to installation delays,additional inspection or costly changes after procurement,For project buyers and engineers,the best starting point is a complete technical inquiry that defines what the piping system requires,
  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.