Company News

Hunan Great Steel Pipe Co., Ltd
plastic coated steel pipe,carbon steel pipe supplier,carbon steel pipe manufacturer

Details of Q345D seamless steel pipes commonly used in industrial projects

Date: 2025-05-23
Details of Q345D seamless steel pipes commonly used in industrial projects ① Implementation standards of Q345D seamless steel pipes: GB/T8162 seamless steel pipes for structures, GB/T8163 seamless steel pipes for conveying fluids, GB/T6479 seamless steel pipes for high-pressure and high-pressure fertilizer equipment, except GB/T8162 seamless steel pipes for structures, GB/T8163 and GB/T6479 should comply with the requirements of the pressure pipeline type test rules ② Chemical composition of Q345D seamless steel pipes: carbon: 0.12~0.18, silicon 0.20~0.50, manganese: 1.2~1.7, chromium: ≤0.30, vanadium: ≤0.15, niobium: ≤0.07, nickel: ≤0.50, phosphorus: not more than 0.025, sulfur not more than 0.015. ③ Mechanical properties of Q345D seamless steel pipe: tensile strength 490~670MPa, yield strength: wall thickness less than or equal to 16mm not less than 345MPa, wall thickness 16mm~40mm not less than 335MPa, wall thickness greater than 40mm not less than 352MPa, elongation after fracture: longitudinal not less than 21, transverse not less than 19, low temperature punching -20℃: longitudinal not less than 40, transverse not less than 27 ④ Heat treatment of Q345D seamless steel pipe: 880℃~940℃ normalizing Q345D seamless steel pipe production process: cold drawing, hot rolling, hot expansion. Q345D seamless steel pipe delivery status: hot rolling, heat treatment. Q345D seamless steel pipe product outer diameter 21.3mm~762mm wall thickness 3mm~140mm The usual length of the Q345D seamless steel pipe is 4000 mm~12000 mm. After negotiation between the supplier and the buyer, and with the above indication in the contract, steel pipes with a length greater than 12,000 mm can be delivered; steel pipes with a length less than 4,000 mm but not less than 3,000 mm can also be delivered, and the quantity should not exceed 5% of the total quantity of steel pipes delivered in this batch. Steel pipes should be manufactured by hot rolling (extrusion, expansion) or cold drawing (rolling) seamless method. When the buyer specifies a method to manufacture steel pipes, it should be indicated in the contract. Delivery status Steel pipes should be delivered in a heat-treated state. The heat treatment system of steel pipes should comply with regulations. The heat treatment system should be filled in the quality certificate. Steel pipes directly rolled from ingots should be inspected at low magnification. No visible white spots, inclusions, subcutaneous bubbles, skin folding, and delamination are allowed on the acid immersion test piece of the steel pipe cross-section. Cracks, folds, rolling folds, scars, and delamination are not allowed on the inner and outer surfaces of Q345D steel pipes. These defects should be completely removed, and the removal depth should not exceed the negative deviation of the nominal wall thickness. The actual wall thickness at the cleaned location should not be less than the minimum allowed by the wall thickness. On the inner and outer surfaces of the steel pipe, the allowable depth of the straight line is as follows: cold-drawn (rolled) steel pipe: not more than 4% of the wall thickness, the maximum depth is 0.2 mm; hot rolled (extruded, expanded) steel pipe: not more than 5% of the wall thickness, the maximum depth is 0.4 mm. Other local defects that do not exceed the negative deviation of the wall thickness are allowed to exist. Post time: May-23-2025

Latest news list

  • FBE steel pipe field joint coating,FBE pipe welding protection,field joint coating,FBE coating repair,FBE field joint inspection
    FBE (fusion-bonded epoxy) coating provides external corrosion protection for steel pipes used in pipeline projects,However,during pipeline construction,the coating near pipe ends must be protected while individual pipe sections are joined by welding,The exposed joint area then requires a suitable field joint coating system,If this work is not properly controlled,damage or poor bonding at the joint can compromise the continuity of the pipeline's corrosion protection,Protecting the factory coating and applying the correct field joint system are therefore important parts of pipeline construction,
  • how to choose FBE coated steel pipe,FBE pipe selection,FBE coated pipeline requirements,FBE coated steel pipe size,FBE coated steel pipe purchase
    Selecting FBE coated steel pipes for a pipeline project involves more than specifying pipe diameter,wall thickness and coating thickness,Buyers must consider the base pipe,coating system,operating environment,installation conditions and inspection requirements as one coordinated package,A well-defined purchase specification helps prevent material mismatches,coating defects and documentation gaps before production begins,The following points provide a practical checklist for engineers,EPC contractors and procurement teams,
  • FBE coating and cathodic protection,FBE coated steel pipe,external pipeline corrosion control,cathodic protection monitoring,FBE coating disbondment
    Buried steel pipelines are exposed to moisture,soil chemicals and other environmental conditions that can cause external corrosion,To reduce this risk,pipeline projects commonly combine external fusion-bonded epoxy (FBE) coating with cathodic protection (CP),Although both methods help protect steel against corrosion,they work in different ways,FBE coating provides a physical barrier between the pipe surface and its surroundings,while cathodic protection uses an electrochemical process to reduce corrosion at exposed areas,Their effectiveness depends on proper design,installation,inspection and long-term monitoring,
  • FBE coated steel pipe quality control,FBE coating inspection,FBE coating thickness measurement,FBE pipe inspection,FBE coating quality control
    The quality of an FBE (Fusion Bonded Epoxy) coated steel pipe cannot be judged by its appearance alone,A smooth coating surface does not necessarily mean that the coating has achieved the required thickness,adhesion,or curing condition,For pipeline applications,quality control starts with the incoming bare steel pipe and continues through surface preparation,coating application,curing,and final inspection,Each stage should follow an approved procedure and the requirements specified for the project,A documented inspection process also allows buyers to verify that the supplied pipes meet the agreed technical requirements,
  • FBE coated steel pipes for buried pipelines,buried pipeline corrosion protection,FBE coated steel pipe installation
    FBE (Fusion Bonded Epoxy) coating is widely used to protect steel pipes against external corrosion in buried pipeline systems,It forms a protective barrier between the steel surface and the surrounding soil,However,coating performance depends on more than the quality of the factory-applied layer,Soil conditions,transportation,installation,field joint protection and cathodic protection all affect the long-term integrity of a buried pipeline,A reliable protection strategy should address these factors before the pipe is placed underground,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.