Price List

Hunan Great Steel Pipe Co., Ltd
LSAW steel pipe provider,seamless carbon steel pipe,hot dipped galvanized pipe

Forging methods of alloy steel tube

Date: 2019-10-14
Forging methods of alloy steel tube Forging methods of alloy steel tube Forged steel pipe can be divided into free forging, upsetting, extrusion, forging, closed die forging, closed upsetting. Closed die forging and closed upsetting because there is no flash, material utilization is high. With a process or several processes may be complex forgings finishing. Since there is no flash, forging force area is reduced, the required load is reduced. Note, however, can not be restricted completely blank, this should strictly control the volume of the blank, to control the relative position of the forging die and forging measure, efforts to reduce die wear. Orbital can be divided into forging, swaging swing, roll forging, wedge rolling, ring rolling and cross rolling and other means. Orbital, put swaging and rolling ring also used precision forging. In order to improve processing procedures before the material utilization, roll forging and rolling can be used as a cross-elongated material. Alloy steel tubes with the same rotary forging free forging is locally formed, it has the advantage compared to the size of forgings, forging a smaller force under the circumstances can be achieved is formed. Such methods include forging steel pipe,including free forging, machining material to extend from near the free surface of the mold surface, it is difficult to ensure accuracy, so that the direction of movement of the forging dies and swaging process controlled by computer, you can use lower forging force to obtain complex shape, high precision products. For example, the production of varieties, large-size turbine blade forgings. When the steel pipe temperature exceeds 300-400 ℃ (steel blue brittle zone), reaches 700-800 ℃, the deformation resistance will be drastically reduced, the deformation can also be significantly improved. Forged steel pipe according to different temperatures in the region, except for forging forging process and quality requirements, it can be divided into cold, warm forging, hot forging three molding temperature region. This division had a temperature range of no strict boundaries, generally speaking, there are forging recrystallization temperature region is called forging, forging without heating at room temperature is called cold forging. At low temperatures the forging, forgings dimensional change is small. In the following 700 ℃ forging, less oxide formation, and no surface decarburization. Therefore, as long as the steel pipe deformation energy in the energy range of molding, cold forging easy to get good dimensional accuracy and surface finish. Just control the temperature and lubrication cooling, 700 ℃ the following warm forging can also get good accuracy. Hot forging, due to the deformation energy and deformation resistance are small, complex shapes can be forged large forgings. To obtain high dimensional accuracy of forgings, in the temperature 900-1000 ℃ hot forging process. Also, pay attention to improving the working environment for forging. Forging die life (2-5 one thousand forging, warm forging 1-2 ten thousand, ten thousand cold forging 2-5) forging temperature range as compared with the other is shorter, but it’s freedom, low cost . Steel pipe blank when the cold deformation and work hardening, so die withstand high loads, therefore, requires the use of high-strength forging die and to prevent wear and bonded using hard lubricating film processing method. In addition, to prevent the billet crack, intermediate annealing to ensure that the needs of deformation when needed. In order to maintain good lubrication, the blank may be phosphate treatment. When working with continuous bar and wire rod, the current section can not be lubricated process, is studying the possibility of using phosphate lubrication method. Post time: Oct-14-2019

Latest news list

  • stainless welded steel pipe quality control,stainless welded pipe inspection,welded stainless steel pipe testing
    Quality control for stainless welded steel pipe should begin with the incoming material and continue through forming,welding,sizing,finishing and final inspection,For project procurement,checking only the finished pipe is not enough,A reliable inspection process should confirm that the supplied pipe matches the agreed material grade,dimensions,manufacturing requirements,testing requirements and documentation,The exact inspection plan depends on the applicable product standard and purchase specification,For example,ASTM A312 covers straight-seam welded austenitic stainless steel pipe and specifies requirements for chemical composition,mechanical properties and applicable testing,
  • stainless welded steel pipe corrosion,stainless welded pipe maintenance,stainless steel pipe industrial applications
    Stainless welded steel pipe is widely used in industrial systems because stainless steel provides good corrosion resistance in many service environments,However,stainless steel is not corrosion-proof,Chlorides,deposits,contamination,unsuitable material selection,poor fabrication practices and aggressive operating conditions can all create corrosion risks,For this reason,preventing stainless welded steel pipe corrosion starts before installation and continues throughout the service life of the system,
  • stainless welded steel pipe,stainless welded pipe manufacturing,welded stainless steel pipe
    Stainless welded steel pipe is produced by forming stainless steel strip or plate into a tubular shape and joining the longitudinal edges by welding,While the basic process is straightforward,consistent pipe quality depends on controlling the material,forming,weld,dimensions,surface condition and inspection requirements from start to finish,For industrial orders,the manufacturing process must also maintain material traceability and match the pipe with the specified grade,dimensions,standard,surface finish and testing requirements,
  • 3PE anti corrosion steel pipe stock,3PE steel pipe availability,3PE pipe in stock,3PE steel pipe supplier,3PE coated pipe
    Pipeline projects do not always follow the original procurement schedule,A maintenance replacement may become urgent,A construction team may need additional pipe after the main order has been delivered,A distributor may also receive a short-notice customer request,In these situations,3PE anti corrosion steel pipe available from stock can provide an alternative to starting a new production cycle,However,faster availability does not remove the need for technical verification,The pipe must still match the project specification,coating requirements,inspection scope,and delivery conditions,
  • 3PE anti corrosion steel pipe,3PE coated steel pipe,3PE pipe shipment,3PE steel pipe transportation
    For a 3PE anti corrosion steel pipe order,manufacturing is only one part of successful project delivery,The pipe must also be inspected,protected,identified,loaded,transported,and delivered in a condition suitable for the next stage of the project,For overseas pipeline projects,shipment preparation therefore connects technical compliance with logistics execution,Good preparation helps reduce coating damage,identification problems,documentation gaps,and delays at the destination,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.