Product News

Hunan Great Steel Pipe Co., Ltd
erw steel pipe,coated steel pipe,A213 alloy steel pipe

304 stainless steel pipe production method

Date: 2020-09-23
304 stainless steel pipe production method According to different production methods, it can be divided into hot rolled tubes, cold rolled tubes, cold drawn tubes, extruded tubes, etc. 1.1. Hot-rolled stainless steel seamless pipes are generally produced on automatic pipe rolling mills. The solid tube is inspected and cleaned of surface defects, cut to the required length, centered on the perforated end of the tube, and then sent to the heating furnace for heating and piercing on the punching machine. When the perforation continues to rotate and advance at the same time, under the action of the roller and the plug, a cavity is gradually formed inside the tube blank, which is called a capillary tube. And then sent to the automated rolling mill to continue rolling. Finally, the whole wall thickness is uniformed for the whole machine, and the diameter is sizing by the sizing machine to meet the specifications. The use of continuous tube rolling mills to produce hot rolled seamless steel tubes is a more advanced method. 1.2. If you want to obtain seamless pipes with smaller size and better quality, cold rolling, cold drawing or a combination of the two methods must be used. Cold rolling is usually carried out on a two-high rolling mill. The steel pipe is rolled in an annular pass formed by a variable cross-section circular hole groove and a stationary tapered plug. Cold drawing is usually carried out on a single-chain or double-chain cold drawing machine of 0.5-100T. 1.3. The extrusion method is to put the heated tube blank in a closed extrusion cylinder, and the perforated rod and the extrusion rod move together to extrude the extruded part of the smaller die hole. This method can produce steel pipes with smaller diameters. This kind of steel pipe can be divided into two categories: stainless steel seamless steel pipe and stainless steel welded steel pipe (seam pipe). According to the different manufacturing process, it can be: hot-rolled, extruded, cold drawn and cold-rolled. The shape can be divided into round pipes and special-shaped pipes. Round steel pipes are widely used, but there are also some special-shaped stainless steel pipes such as square, rectangular, semicircular, hexagonal, equilateral triangle, and octagonal. For steel pipes subjected to fluid pressure, hydraulic tests must be carried out to verify their pressure resistance and quality, and no leakage, wetting, or expansion under the specified pressure is qualified, and some steel pipes are also subject to crimping tests according to standards or requirements of the buyer. flaring test, flattening test. Seamless stainless steel pipes, also called stainless steel seamless pipes, are made of steel ingots or solid tube blanks that are perforated into capillary tubes, and then made by hot rolling, cold rolling, or cold drawing. The specifications of seamless steel pipes are expressed in millimeters of outer diameter * Wall thickness Post time: Sep-23-2020

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.