Product News

Hunan Great Steel Pipe Co., Ltd
dsaw steel pipe,coated carbon pipe,steel pipe manufacturer

API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2020-03-26

Date: 2020-03-26
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE Post time: Mar-26-2020 API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 681 674 681 668 673 668 673 673 Thickness 9.53 674 662 668 649 654 649 654 654 壁厚 (mm) 10 642 629 636 649 654 649 654 654 12 642 629 636 649 654 649 654 654 14 642 629 636 649 654 649 654 654 16 642 642 649 636 641 636 641 641 18 642 642 649 636 641 636 641 641 20 / / 649 636 641 636 641 641 22 / / 649 636 641 636 641 641 24 / / 649 636 641 636 641 641 26 / / / 649 641 636 641 641 28 / / / / 641 636 641 641 30 / / / / 641 636 641 641 32 / / / / 654 649 654 654 34 / / / / / / 654 654 36 / / / / / / 654 654 38 / / / / / / / / 40 / / / / / / / / FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 673 673 679 679 / / / / Thickness 9.53 673 673 673 673 673 718 705 / 壁厚 (mm) 10 654 654 660 660 660 731 731 / 12 654 654 647 647 647 679 731 / 14 654 654 647 647 647 679 731 / 16 641 660 647 647 647 679 725 / 18 641 660 647 647 647 679 725 / 20 641 660 647 647 647 679 725 / 22 641 660 647 647 647 679 725 / 24 641 660 647 647 647 679 725 / 26 641 660 647 647 647 679 725 / 28 628 647 634 634 634 679 725 / 30 628 647 660 660 660 679 725 / 32 641 660 660 660 660 692 731 / 34 641 660 667 667 667 692 731 / 36 641 660 667 667 667 692 731 / 38 641 660 667 667 667 692 731 / 40 / / / / / 692 731 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valide during March 25-31; 4. The above price is only valide during March 25-31; 4. The above price is only valide during March 25-31; 4. The above price is only valide during March 25-31; 4. The above price is only valide during March 25-31; 4. The above price is only valide during March 25-31; 4. The above price is only valide during March 25-31; 4. The above price is only valide during March 25-31; 4. The above price is only valide during March 25-31; 4. The above price is only valide during March 25-31; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,
  • oil casing export,oil casing shipment,oil casing inspection,oilfield project procurement,oil casing delivery
    Supplying oil casing for an overseas drilling project involves more than arranging shipment,Product specifications,connection requirements,inspection records,packing and delivery schedules must align with the purchase order and project requirements,
  • oil casing service life,oil casing integrity management,oil casing corrosion,oil casing wear,oil casing maintenance
    Oil casing must withstand mechanical loads,pressure changes,temperature variations and potentially corrosive well fluids throughout its service life,Its long-term performance depends not only on the casing grade selected at procurement,but also on well design,operating conditions and integrity management,
  • oil casing grades comparison,J55 casing,K55 casing,N80 casing,P110 casing,casing grade selection
    Choosing the right oil casing grade affects load capacity,specification compliance and procurement cost,J55,K55,N80 and P110 are commonly specified under API 5CT,but they are not interchangeable simply because their dimensions are similar,The correct choice depends on the approved casing design,required mechanical properties,connection performance and service conditions,
  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.