Industry News

Hunan Great Steel Pipe Co., Ltd
A213 alloy steel pipe,dsaw steel pipe,A335 alloy steel pipe

API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2020-06-28

Date: 2020-06-28
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE Post time: Jun-28-2020 API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 670 664 670 657 657 657 657 657 Thickness 9.53 664 651 657 638 638 638 638 638 壁厚 (mm) 10 632 619 626 638 638 638 638 638 12 632 619 626 638 638 638 638 638 14 632 619 626 638 638 638 638 638 16 632 632 638 626 626 626 626 626 18 / 632 638 626 626 626 626 626 20 / / 638 626 626 626 626 626 22 / / 638 626 626 626 626 626 24 / / 638 626 626 626 626 626 26 / / / 638 626 626 626 626 28 / / / / 626 626 626 626 30 / / / / 626 626 626 626 32 / / / / 638 638 638 638 34 / / / / / / 638 638 36 / / / / / / 638 638 38 / / / / / / / / 40 / / / / / / / / FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 657 657 664 664 / / / / Thickness 9.53 657 657 657 657 657 702 689 / 壁厚 (mm) 10 638 638 645 645 645 714 714 / 12 638 638 632 632 632 664 714 / 14 638 638 632 632 632 664 714 / 16 626 645 632 632 632 664 708 / 18 626 645 632 632 632 664 708 / 20 626 645 632 632 632 664 708 / 22 626 645 632 632 632 664 708 / 24 626 645 632 632 632 664 708 / 26 626 645 632 632 632 664 708 / 28 613 632 619 619 619 664 708 / 30 613 632 645 645 645 664 708 / 32 626 645 645 645 645 676 714 / 34 626 645 651 651 651 676 714 / 36 626 645 651 651 651 676 714 / 38 626 645 651 651 651 676 714 / 40 / / / / / 676 714 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valid during June 25th-July 02th; 4. The above price is only valid during June 25th-July 02th; 4. The above price is only valid during June 25th-July 02th; 4. The above price is only valid during June 25th-July 02th; 4. The above price is only valid during June 25th-July 02th; 4. The above price is only valid during June 25th-July 02th; 4. The above price is only valid during June 25th-July 02th; 4. The above price is only valid during June 25th-July 02th; 4. The above price is only valid during June 25th-July 02th; 4. The above price is only valid during June 25th-July 02th; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,
  • oil casing export,oil casing shipment,oil casing inspection,oilfield project procurement,oil casing delivery
    Supplying oil casing for an overseas drilling project involves more than arranging shipment,Product specifications,connection requirements,inspection records,packing and delivery schedules must align with the purchase order and project requirements,
  • oil casing service life,oil casing integrity management,oil casing corrosion,oil casing wear,oil casing maintenance
    Oil casing must withstand mechanical loads,pressure changes,temperature variations and potentially corrosive well fluids throughout its service life,Its long-term performance depends not only on the casing grade selected at procurement,but also on well design,operating conditions and integrity management,
  • oil casing grades comparison,J55 casing,K55 casing,N80 casing,P110 casing,casing grade selection
    Choosing the right oil casing grade affects load capacity,specification compliance and procurement cost,J55,K55,N80 and P110 are commonly specified under API 5CT,but they are not interchangeable simply because their dimensions are similar,The correct choice depends on the approved casing design,required mechanical properties,connection performance and service conditions,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.