Price List

Hunan Great Steel Pipe Co., Ltd
steel pipe supplier,square galvanized pipe,dsaw steel pipe

API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2020-07-09

Date: 2020-07-09
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE Post time: Jul-09-2020 API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 670 664 670 657 657 657 657 657 Thickness 9.53 664 651 657 638 638 638 638 638 壁厚 (mm) 10 632 619 626 638 638 638 638 638 12 632 619 626 638 638 638 638 638 14 632 619 626 638 638 638 638 638 16 632 632 638 626 626 626 626 626 18 / 632 638 626 626 626 626 626 20 / / 638 626 626 626 626 626 22 / / 638 626 626 626 626 626 24 / / 638 626 626 626 626 626 26 / / / 638 626 626 626 626 28 / / / / 626 626 626 626 30 / / / / 626 626 626 626 32 / / / / 638 638 638 638 34 / / / / / / 638 638 36 / / / / / / 638 638 38 / / / / / / / / 40 / / / / / / / / FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 657 657 664 664 / / / / Thickness 9.53 657 657 657 657 657 702 689 / 壁厚 (mm) 10 638 638 645 645 645 714 714 / 12 638 638 632 632 632 664 714 / 14 638 638 632 632 632 664 714 / 16 626 645 632 632 632 664 708 / 18 626 645 632 632 632 664 708 / 20 626 645 632 632 632 664 708 / 22 626 645 632 632 632 664 708 / 24 626 645 632 632 632 664 708 / 26 626 645 632 632 632 664 708 / 28 613 632 619 619 619 664 708 / 30 613 632 645 645 645 664 708 / 32 626 645 645 645 645 676 714 / 34 626 645 651 651 651 676 714 / 36 626 645 651 651 651 676 714 / 38 626 645 651 651 651 676 714 / 40 / / / / / 676 714 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,
  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.