Price List

Hunan Great Steel Pipe Co., Ltd
steel pipe supplier,square galvanized pipe,dsaw steel pipe

API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2020-07-09

Date: 2020-07-09
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE Post time: Jul-09-2020 API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 670 664 670 657 657 657 657 657 Thickness 9.53 664 651 657 638 638 638 638 638 壁厚 (mm) 10 632 619 626 638 638 638 638 638 12 632 619 626 638 638 638 638 638 14 632 619 626 638 638 638 638 638 16 632 632 638 626 626 626 626 626 18 / 632 638 626 626 626 626 626 20 / / 638 626 626 626 626 626 22 / / 638 626 626 626 626 626 24 / / 638 626 626 626 626 626 26 / / / 638 626 626 626 626 28 / / / / 626 626 626 626 30 / / / / 626 626 626 626 32 / / / / 638 638 638 638 34 / / / / / / 638 638 36 / / / / / / 638 638 38 / / / / / / / / 40 / / / / / / / / FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 657 657 664 664 / / / / Thickness 9.53 657 657 657 657 657 702 689 / 壁厚 (mm) 10 638 638 645 645 645 714 714 / 12 638 638 632 632 632 664 714 / 14 638 638 632 632 632 664 714 / 16 626 645 632 632 632 664 708 / 18 626 645 632 632 632 664 708 / 20 626 645 632 632 632 664 708 / 22 626 645 632 632 632 664 708 / 24 626 645 632 632 632 664 708 / 26 626 645 632 632 632 664 708 / 28 613 632 619 619 619 664 708 / 30 613 632 645 645 645 664 708 / 32 626 645 645 645 645 676 714 / 34 626 645 651 651 651 676 714 / 36 626 645 651 651 651 676 714 / 38 626 645 651 651 651 676 714 / 40 / / / / / 676 714 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 4. The above price is only valide during July 9th–July 16th; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • LSAW steel pipe maintenance,LSAW pipe maintenance,LSAW steel pipe inspection,LSAW pipeline maintenance
    Installing a properly specified LSAW steel pipe does not eliminate the need for pipeline maintenance,Once a pipeline enters service,corrosion,coating deterioration,mechanical loading,ground movement,operating changes,and environmental exposure can gradually affect its condition,For large-diameter pipelines,a practical maintenance program should focus on identifying changes early and taking corrective action before a manageable condition develops into an integrity problem,The objective is not simply to inspect the pipe,It is to understand the condition of the complete pipeline system and respond based on evidence,
  • LSAW steel pipe,LSAW steel pipe for high pressure,high-pressure pipeline,LSAW pipe wall thickness
    High-pressure pipeline systems place demanding requirements on pipe material,dimensions,weld integrity,inspection,and operating conditions,For large-diameter pipelines,LSAW steel pipe can be an effective solution because its manufacturing process allows large outside diameters and substantial wall thicknesses to be produced from steel plate,However,selecting LSAW steel pipe for pressure service is not simply a matter of choosing a thicker wall,The pipe specification needs to match the actual design pressure,temperature,fluid,diameter,applicable code,and service environment,
  • LSAW steel pipe corrosion,LSAW steel pipe coating,3PE coated LSAW steel pipe,FBE coated steel pipe
    LSAW steel pipe is widely used for large-diameter water transmission,buried pipelines,and other infrastructure projects where strength,dimensional control,and long-term service reliability are important,However,pipe strength alone does not prevent corrosion,For buried or water pipeline systems,corrosion protection should be considered from material selection and coating through transportation,field welding,installation,and long-term inspection,A coating system should also be selected according to the actual operating environment rather than simply by initial cost,
  • LSAW steel pipe shipment,LSAW steel pipe export,large diameter steel pipe,LSAW pipe inspection
    For a large-diameter LSAW steel pipe project,manufacturing is only one part of the delivery process,The pipe must meet the approved technical specification,pass the required inspections,receive the correct end preparation and surface protection,and reach the port in suitable condition for international transportation,A recent export order provides a practical example of how technical,quality and logistics activities need to work together before shipment,
  • LSAW steel pipe for water transmission,LSAW water pipe,large diameter LSAW steel pipe,LSAW steel pipe coating
    Large-diameter LSAW steel pipe is widely used for water transmission projects where high flow capacity,large diameters and project-specific wall thicknesses are required,Its longitudinal welded construction also allows manufacturers to produce pipe to defined dimensions and mechanical requirements,But selecting the right LSAW pipe is only one part of pipeline reliability,Hydraulic conditions,pressure transients,internal water quality,corrosion protection,field welding and installation all affect long-term performance,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.