API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2020-07-28
Date: 2020-07-28
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
Post time: Jul-28-2020
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
FOB TIANJIN
FOB TIANJIN
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
USD/TON
USD/TON
406
457
508
609.6
711.1
762
812
863.6
Wall
8
702
696
702
690
695
695
695
695
Thickness
9.53
696
683
690
671
676
676
676
676
壁厚 (mm)
10
664
652
658
671
676
676
676
676
12
664
652
658
671
676
676
676
676
14
664
652
658
671
676
676
676
676
16
664
664
671
658
663
663
663
663
18
/
664
671
658
663
663
663
663
20
/
/
671
658
663
663
663
663
22
/
/
671
658
663
663
663
663
24
/
/
671
658
663
663
663
663
26
/
/
/
671
663
663
663
663
28
/
/
/
/
663
663
663
663
30
/
/
/
/
663
663
663
663
32
/
/
/
/
676
676
676
676
34
/
/
/
/
/
/
676
676
36
/
/
/
/
/
/
676
676
38
/
/
/
/
/
/
/
/
40
/
/
/
/
/
/
/
/
FOB TIANJIN
FOB TIANJIN
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
USD/TON
USD/TON
914
1016
1066.7
1117.6
1219.2
1320.8
1422.4
/
Wall
8
695
695
701
701
/
/
/
/
Thickness
9.53
695
695
695
695
695
739
727
/
壁厚 (mm)
10
676
676
682
682
682
752
752
/
12
676
676
669
669
669
701
752
/
14
676
676
669
669
669
701
752
/
16
663
682
669
669
669
701
746
/
18
663
682
669
669
669
701
746
/
20
663
682
669
669
669
701
746
/
22
663
682
669
669
669
701
746
/
24
663
682
669
669
669
701
746
/
26
663
682
669
669
669
701
746
/
28
650
669
657
657
657
701
746
/
30
650
669
682
682
682
701
746
/
32
663
682
682
682
682
714
752
/
34
663
682
688
688
688
714
752
/
36
663
682
688
688
688
714
752
/
38
663
682
688
688
688
714
752
/
40
/
/
/
/
/
714
752
/
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
4. The above price is only valide during July 28-August 04;
4. The above price is only valide during July 28-August 04;
4. The above price is only valide during July 28-August 04;
4. The above price is only valide during July 28-August 04;
4. The above price is only valide during July 28-August 04;
4. The above price is only valide during July 28-August 04;
4. The above price is only valide during July 28-August 04;
4. The above price is only valide during July 28-August 04;
4. The above price is only valide during July 28-August 04;
4. The above price is only valide during July 28-August 04;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;