Industry News

Hunan Great Steel Pipe Co., Ltd
SSAW steel pipe provider,api 51 line pipe,electric resistance welded pipe

API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2020-08-12

Date: 2020-08-12
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE Post time: Aug-12-2020 API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 721 708 714 704 704 704 704 704 Thickness 9.53 688 674 681 694 704 704 704 704 壁厚 (mm) 10 688 674 681 694 704 704 704 704 12 688 674 681 694 704 704 704 704 14 688 688 694 681 691 691 691 691 16 688 688 694 681 691 691 691 691 18 / / 694 681 691 691 691 691 20 / / 694 681 691 691 691 691 22 / / 694 681 691 691 691 691 24 / / / 694 691 691 691 691 26 / / / / 691 691 691 691 28 / / / / 691 691 691 691 30 / / / / 704 704 704 704 32 / / / / / / 704 704 34 / / / / / / 704 704 36 / / / / / / / / 38 / / / / / / / / 40 / / / / / / / / FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 729 729 736 736 / / / / Thickness 9.53 729 729 729 729 729 776 763 / 壁厚 (mm) 10 709 709 716 716 716 789 789 / 12 709 709 703 703 703 736 789 / 14 709 709 703 703 703 736 789 / 16 696 716 703 703 703 736 783 / 18 696 716 703 703 703 736 783 / 20 696 716 703 703 703 736 783 / 22 696 716 703 703 703 736 783 / 24 696 716 703 703 703 736 783 / 26 696 716 703 703 703 736 783 / 28 683 703 689 689 689 736 783 / 30 683 703 716 716 716 736 783 / 32 696 716 716 716 716 749 789 / 34 696 716 723 723 723 749 789 / 36 696 716 723 723 723 749 789 / 38 696 716 723 723 723 749 789 / 40 / / / / / 749 789 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valide during August 9-16; 4. The above price is only valide during August 9-16; 4. The above price is only valide during August 9-16; 4. The above price is only valide during August 9-16; 4. The above price is only valide during August 9-16; 4. The above price is only valide during August 9-16; 4. The above price is only valide during August 9-16; 4. The above price is only valide during August 9-16; 4. The above price is only valide during August 9-16; 4. The above price is only valide during August 9-16; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,
  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.