API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2020-08-12
Date: 2020-08-12
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
Post time: Aug-12-2020
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
FOB TIANJIN
FOB TIANJIN
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
USD/TON
USD/TON
406
457
508
609.6
711.1
762
812
863.6
Wall
8
721
708
714
704
704
704
704
704
Thickness
9.53
688
674
681
694
704
704
704
704
壁厚 (mm)
10
688
674
681
694
704
704
704
704
12
688
674
681
694
704
704
704
704
14
688
688
694
681
691
691
691
691
16
688
688
694
681
691
691
691
691
18
/
/
694
681
691
691
691
691
20
/
/
694
681
691
691
691
691
22
/
/
694
681
691
691
691
691
24
/
/
/
694
691
691
691
691
26
/
/
/
/
691
691
691
691
28
/
/
/
/
691
691
691
691
30
/
/
/
/
704
704
704
704
32
/
/
/
/
/
/
704
704
34
/
/
/
/
/
/
704
704
36
/
/
/
/
/
/
/
/
38
/
/
/
/
/
/
/
/
40
/
/
/
/
/
/
/
/
FOB TIANJIN
FOB TIANJIN
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
USD/TON
USD/TON
914
1016
1066.7
1117.6
1219.2
1320.8
1422.4
/
Wall
8
729
729
736
736
/
/
/
/
Thickness
9.53
729
729
729
729
729
776
763
/
壁厚 (mm)
10
709
709
716
716
716
789
789
/
12
709
709
703
703
703
736
789
/
14
709
709
703
703
703
736
789
/
16
696
716
703
703
703
736
783
/
18
696
716
703
703
703
736
783
/
20
696
716
703
703
703
736
783
/
22
696
716
703
703
703
736
783
/
24
696
716
703
703
703
736
783
/
26
696
716
703
703
703
736
783
/
28
683
703
689
689
689
736
783
/
30
683
703
716
716
716
736
783
/
32
696
716
716
716
716
749
789
/
34
696
716
723
723
723
749
789
/
36
696
716
723
723
723
749
789
/
38
696
716
723
723
723
749
789
/
40
/
/
/
/
/
749
789
/
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
4. The above price is only valide during August 9-16;
4. The above price is only valide during August 9-16;
4. The above price is only valide during August 9-16;
4. The above price is only valide during August 9-16;
4. The above price is only valide during August 9-16;
4. The above price is only valide during August 9-16;
4. The above price is only valide during August 9-16;
4. The above price is only valide during August 9-16;
4. The above price is only valide during August 9-16;
4. The above price is only valide during August 9-16;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;