Company News

Hunan Great Steel Pipe Co., Ltd
straight seam welded pipe,galvanized pipe,api 51 line pipe

API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2020-08-17

Date: 2020-08-17
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE Post time: Aug-17-2020 API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 700 694 700 687 674 674 674 674 Thickness 9.53 694 681 687 669 674 674 674 674 壁厚 (mm) 10 662 650 656 669 674 674 674 674 12 662 650 656 669 674 674 674 674 14 662 650 656 669 661 661 661 661 16 662 662 669 656 661 661 661 661 18 662 662 669 656 661 661 661 661 20 / / 669 656 661 661 661 661 22 / / 669 656 661 661 661 661 24 / / 669 656 661 661 661 661 26 / / / 669 661 661 661 661 28 / / / / 661 661 661 661 30 / / / / 674 674 674 674 32 / / / / / / 674 674 34 / / / / / / 674 674 36 / / / / / / / / 38 / / / / / / / / 40 / / / / / / / / FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 692 692 699 699 / / / / Thickness 9.53 692 692 692 692 692 736 724 / 壁厚 (mm) 10 674 674 680 680 680 749 749 / 12 674 674 667 667 667 699 749 / 14 674 674 667 667 667 699 749 / 16 661 680 667 667 667 699 743 / 18 661 680 667 667 667 699 743 / 20 661 680 667 667 667 699 743 / 22 661 680 667 667 667 699 743 / 24 661 680 667 667 667 699 743 / 26 661 680 667 667 667 699 743 / 28 648 667 655 655 655 699 743 / 30 648 667 680 680 680 699 743 / 32 661 680 680 680 680 711 749 / 34 661 680 686 686 686 711 749 / 36 661 680 686 686 686 711 749 / 38 661 680 686 686 686 711 749 / 40 / / / / / / / / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valide during August 17-23; 4. The above price is only valide during August 17-23; 4. The above price is only valide during August 17-23; 4. The above price is only valide during August 17-23; 4. The above price is only valide during August 17-23; 4. The above price is only valide during August 17-23; 4. The above price is only valide during August 17-23; 4. The above price is only valide during August 17-23; 4. The above price is only valide during August 17-23; 4. The above price is only valide during August 17-23; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,
  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.