API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2020-08-17
Date: 2020-08-17
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
Post time: Aug-17-2020
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
FOB TIANJIN
FOB TIANJIN
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
USD/TON
USD/TON
406
457
508
609.6
711.1
762
812
863.6
Wall
8
700
694
700
687
674
674
674
674
Thickness
9.53
694
681
687
669
674
674
674
674
壁厚 (mm)
10
662
650
656
669
674
674
674
674
12
662
650
656
669
674
674
674
674
14
662
650
656
669
661
661
661
661
16
662
662
669
656
661
661
661
661
18
662
662
669
656
661
661
661
661
20
/
/
669
656
661
661
661
661
22
/
/
669
656
661
661
661
661
24
/
/
669
656
661
661
661
661
26
/
/
/
669
661
661
661
661
28
/
/
/
/
661
661
661
661
30
/
/
/
/
674
674
674
674
32
/
/
/
/
/
/
674
674
34
/
/
/
/
/
/
674
674
36
/
/
/
/
/
/
/
/
38
/
/
/
/
/
/
/
/
40
/
/
/
/
/
/
/
/
FOB TIANJIN
FOB TIANJIN
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
USD/TON
USD/TON
914
1016
1066.7
1117.6
1219.2
1320.8
1422.4
/
Wall
8
692
692
699
699
/
/
/
/
Thickness
9.53
692
692
692
692
692
736
724
/
壁厚 (mm)
10
674
674
680
680
680
749
749
/
12
674
674
667
667
667
699
749
/
14
674
674
667
667
667
699
749
/
16
661
680
667
667
667
699
743
/
18
661
680
667
667
667
699
743
/
20
661
680
667
667
667
699
743
/
22
661
680
667
667
667
699
743
/
24
661
680
667
667
667
699
743
/
26
661
680
667
667
667
699
743
/
28
648
667
655
655
655
699
743
/
30
648
667
680
680
680
699
743
/
32
661
680
680
680
680
711
749
/
34
661
680
686
686
686
711
749
/
36
661
680
686
686
686
711
749
/
38
661
680
686
686
686
711
749
/
40
/
/
/
/
/
/
/
/
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
4. The above price is only valide during August 17-23;
4. The above price is only valide during August 17-23;
4. The above price is only valide during August 17-23;
4. The above price is only valide during August 17-23;
4. The above price is only valide during August 17-23;
4. The above price is only valide during August 17-23;
4. The above price is only valide during August 17-23;
4. The above price is only valide during August 17-23;
4. The above price is only valide during August 17-23;
4. The above price is only valide during August 17-23;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;