Product News

Hunan Great Steel Pipe Co., Ltd
rectangular galvanized steel pipe,spiral welded pipe,api 51 line pipe

API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2020-10-25

Date: 2020-10-25
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE Post time: Oct-25-2020 API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 723 716 723 709 709 709 709 709 Thickness 9.53 716 703 709 689 689 689 689 689 壁厚 (mm) 10 683 669 676 689 689 689 689 689 12 683 669 676 689 689 689 689 689 14 683 669 676 689 689 689 689 689 16 683 683 689 676 676 676 676 676 18 / 683 689 676 676 676 676 676 20 / / 689 676 676 676 676 676 22 / / 689 676 676 676 676 676 24 / / 689 676 676 676 676 676 26 / / / 689 676 676 676 676 28 / / / / 676 676 676 676 30 / / / / 676 676 676 676 32 / / / / 689 689 689 689 34 / / / / / / 689 689 36 / / / / / / 689 689 38 / / / / / / / / 40 / / / / / / / / FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 709 709 716 716 / / / / Thickness 9.53 709 709 709 709 709 756 743 / 壁厚 (mm) 10 689 689 696 696 696 769 731 / 12 689 689 683 683 683 716 731 / 14 689 689 683 683 683 716 731 / 16 676 696 683 683 683 716 724 / 18 676 696 683 683 683 716 724 / 20 676 696 683 683 683 716 724 / 22 676 696 683 683 683 716 724 / 24 676 696 683 683 683 716 724 / 26 676 696 683 683 683 716 724 / 28 663 683 669 669 669 716 724 / 30 663 683 696 696 696 716 724 / 32 676 696 696 696 696 729 731 / 34 676 696 703 703 703 729 731 / 36 676 696 703 703 703 729 731 / 38 676 696 703 703 703 729 731 / 40 / / / / / 729 731 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valid during October 25th–Novermber 01st; 4. The above price is only valid during October 25th–Novermber 01st; 4. The above price is only valid during October 25th–Novermber 01st; 4. The above price is only valid during October 25th–Novermber 01st; 4. The above price is only valid during October 25th–Novermber 01st; 4. The above price is only valid during October 25th–Novermber 01st; 4. The above price is only valid during October 25th–Novermber 01st; 4. The above price is only valid during October 25th–Novermber 01st; 4. The above price is only valid during October 25th–Novermber 01st; 4. The above price is only valid during October 25th–Novermber 01st; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.