API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2020-12-09
Date: 2020-12-09
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
Post time: Dec-09-2020
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
FOB TIANJIN
FOB TIANJIN
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
USD/TON
USD/TON
406
457
508
609.6
711.1
762
812
863.6
Wall
8
786
773
779
759
759
759
759
759
Thickness
9.53
752
738
745
759
759
759
759
759
壁厚 (mm)
10
752
738
745
759
759
759
759
759
12
752
738
745
759
759
759
759
759
14
752
752
759
745
745
745
745
745
16
752
752
759
745
745
745
745
745
18
/
/
759
745
745
745
745
745
20
/
/
759
745
745
745
745
745
22
/
/
759
745
745
745
745
745
24
/
/
/
759
745
745
745
745
26
/
/
/
/
745
745
745
745
28
/
/
/
/
745
745
745
745
30
/
/
/
/
759
759
759
759
32
/
/
/
/
/
/
759
759
34
/
/
/
/
/
/
759
759
36
/
/
/
/
/
/
/
/
38
/
/
/
/
/
/
/
/
40
/
/
/
/
/
/
/
/
FOB TIANJIN
FOB TIANJIN
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
USD/TON
USD/TON
914
1016
1066.7
1117.6
1219.2
1320.8
1422.4
/
Wall
8
794
794
801
801
/
/
/
/
Thickness
9.53
794
794
794
794
794
843
829
/
壁厚 (mm)
10
774
774
781
781
781
857
857
/
12
774
774
767
767
767
801
857
/
14
774
774
767
767
767
801
857
/
16
760
781
767
767
767
801
850
/
18
760
781
767
767
767
801
850
/
20
760
781
767
767
767
801
850
/
22
760
781
767
767
767
801
850
/
24
760
781
767
767
767
801
850
/
26
760
781
767
767
767
801
850
/
28
746
767
753
753
753
801
850
/
30
746
767
781
781
781
801
850
/
32
760
781
781
781
781
815
857
/
34
760
781
788
788
788
815
857
/
36
760
781
788
788
788
815
857
/
38
760
781
788
788
788
815
857
/
40
/
/
/
/
/
815
857
/
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
4. The above price is only valide during December 09-16;
4. The above price is only valide during December 09-16;
4. The above price is only valide during December 09-16;
4. The above price is only valide during December 09-16;
4. The above price is only valide during December 09-16;
4. The above price is only valide during December 09-16;
4. The above price is only valide during December 09-16;
4. The above price is only valide during December 09-16;
4. The above price is only valide during December 09-16;
4. The above price is only valide during December 09-16;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;