Company News

Hunan Great Steel Pipe Co., Ltd
steel pipe supplier,square galvanized pipe,dsaw steel pipe

API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2021-01-02

Date: 2021-01-02
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE Post time: Jan-02-2021 API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 763 756 763 749 749 749 749 749 Thickness 9.53 756 742 749 729 729 729 729 729 壁厚 (mm) 10 722 708 715 729 729 729 729 729 12 722 708 715 729 729 729 729 729 14 722 708 715 729 729 729 729 729 16 722 722 729 715 715 715 715 715 18 / 722 729 715 715 715 715 715 20 / / 729 715 715 715 715 715 22 / / 729 715 715 715 715 715 24 / / 729 715 715 715 715 715 26 / / / 729 715 715 715 715 28 / / / / 715 715 715 715 30 / / / / 715 715 715 715 32 / / / / 729 729 729 729 34 / / / / / / 729 729 36 / / / / / / 729 729 38 / / / / / / / / 40 / / / / / / / / FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 749 749 756 756 / / / / Thickness 9.53 749 749 749 749 749 797 783 / 壁厚 (mm) 10 729 729 735 735 735 811 811 / 12 729 729 722 722 722 756 811 / 14 729 729 722 722 722 756 811 / 16 715 735 722 722 722 756 804 / 18 715 735 722 722 722 756 804 / 20 715 735 722 722 722 756 804 / 22 715 735 722 722 722 756 804 / 24 715 735 722 722 722 756 804 / 26 715 735 722 722 722 756 804 / 28 701 722 708 708 708 756 804 / 30 701 722 735 735 735 756 804 / 32 715 735 735 735 735 770 811 / 34 715 735 742 742 742 770 811 / 36 715 735 742 742 742 770 811 / 38 715 735 742 742 742 770 811 / 40 / / / / / 770 811 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,
  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.