Company News

Hunan Great Steel Pipe Co., Ltd
steel pipe supplier,square galvanized pipe,dsaw steel pipe

API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2021-01-02

Date: 2021-01-02
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE Post time: Jan-02-2021 API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 763 756 763 749 749 749 749 749 Thickness 9.53 756 742 749 729 729 729 729 729 壁厚 (mm) 10 722 708 715 729 729 729 729 729 12 722 708 715 729 729 729 729 729 14 722 708 715 729 729 729 729 729 16 722 722 729 715 715 715 715 715 18 / 722 729 715 715 715 715 715 20 / / 729 715 715 715 715 715 22 / / 729 715 715 715 715 715 24 / / 729 715 715 715 715 715 26 / / / 729 715 715 715 715 28 / / / / 715 715 715 715 30 / / / / 715 715 715 715 32 / / / / 729 729 729 729 34 / / / / / / 729 729 36 / / / / / / 729 729 38 / / / / / / / / 40 / / / / / / / / FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 749 749 756 756 / / / / Thickness 9.53 749 749 749 749 749 797 783 / 壁厚 (mm) 10 729 729 735 735 735 811 811 / 12 729 729 722 722 722 756 811 / 14 729 729 722 722 722 756 811 / 16 715 735 722 722 722 756 804 / 18 715 735 722 722 722 756 804 / 20 715 735 722 722 722 756 804 / 22 715 735 722 722 722 756 804 / 24 715 735 722 722 722 756 804 / 26 715 735 722 722 722 756 804 / 28 701 722 708 708 708 756 804 / 30 701 722 735 735 735 756 804 / 32 715 735 735 735 735 770 811 / 34 715 735 742 742 742 770 811 / 36 715 735 742 742 742 770 811 / 38 715 735 742 742 742 770 811 / 40 / / / / / 770 811 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 4. The above price is only valid during Jan. 2nd – Jan. 8th 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.