API 5LASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2021-08-25
Date: 2021-04-25
API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
Post time: Aug-25-2021
API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE
FOB TIANJIN
FOB TIANJIN
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
USD/TON
USD/TON
406
457
508
609.6
711.1
762
812
863.6
Wall
8
1,089
1,081
1,089
1,074
1,074
1,074
116
1,074
Thickness
9.53
1,081
1,066
1,074
1,050
1,050
1,050
114
1,050
壁厚 (mm)
10
1,043
1,027
1,035
1,050
1,050
1,050
114
1,050
12
1,043
1,027
1,035
1,050
1,050
1,050
114
1,050
14
1,043
1,027
1,035
1,050
1,050
1,050
114
1,050
16
1,043
1,043
1,050
1,035
1,035
1,035
112
1,035
18
/
1,043
1,050
1,035
1,035
1,035
112
1,035
20
/
/
1,050
1,035
1,035
1,035
112
1,035
22
/
/
1,050
1,035
1,035
1,035
112
1,035
24
/
/
1,050
1,035
1,035
1,035
112
1,035
26
/
/
/
1,050
1,035
1,035
112
1,035
28
/
/
/
/
1,035
1,035
112
1,035
30
/
/
/
/
1,035
1,035
112
1,035
32
/
/
/
/
1,050
1,050
114
1,050
34
/
/
/
/
/
/
114
1,050
36
/
/
/
/
/
/
114
1,050
38
/
/
/
/
/
/
/
/
40
/
/
/
/
/
/
/
/
FOB TIANJIN
FOB TIANJIN
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
USD/TON
USD/TON
914
1016
1066.7
1117.6
1219.2
1320.8
1422.4
/
Wall
8
996
996
1004
1004
/
/
/
/
Thickness
9.53
996
996
996
996
996
1050
1035
/
壁厚 (mm)
10
973
973
981
981
981
1066
1066
/
12
973
973
965
965
965
1004
1066
/
14
973
973
965
965
965
1004
1066
/
16
957
981
965
965
965
1004
1058
/
18
957
981
965
965
965
1004
1058
/
20
957
981
965
965
965
1004
1058
/
22
957
981
965
965
965
1004
1058
/
24
957
981
965
965
965
1004
1058
/
26
957
981
965
965
965
1004
1058
/
28
942
965
950
950
950
1004
1058
/
30
942
965
981
981
981
1004
1058
/
32
957
981
981
981
981
1019
1066
/
34
957
981
988
988
988
1019
1066
/
36
957
981
988
988
988
1019
1066
/
38
957
981
988
988
988
1019
1066
/
40
/
/
/
/
/
1019
1066
/
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
3. The above price is NOT including any packing and end processing charge;
3. The above price is NOT including any packing and end processing charge;
3. The above price is NOT including any packing and end processing charge;
3. The above price is NOT including any packing and end processing charge;
3. The above price is NOT including any packing and end processing charge;
3. The above price is NOT including any packing and end processing charge;
3. The above price is NOT including any packing and end processing charge;
3. The above price is NOT including any packing and end processing charge;
3. The above price is NOT including any packing and end processing charge;
3. The above price is NOT including any packing and end processing charge;
4. The above price is only valid during August 25th-August 31th;
4. The above price is only valid during August 25th-August 31th;
4. The above price is only valid during August 25th-August 31th;
4. The above price is only valid during August 25th-August 31th;
4. The above price is only valid during August 25th-August 31th;
4. The above price is only valid during August 25th-August 31th;
4. The above price is only valid during August 25th-August 31th;
4. The above price is only valid during August 25th-August 31th;
4. The above price is only valid during August 25th-August 31th;
4. The above price is only valid during August 25th-August 31th;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
6. For more information and CIF price,please contact us;
6. For more information and CIF price,please contact us;
6. For more information and CIF price,please contact us;
6. For more information and CIF price,please contact us;
6. For more information and CIF price,please contact us;
6. For more information and CIF price,please contact us;
6. For more information and CIF price,please contact us;
6. For more information and CIF price,please contact us;
6. For more information and CIF price,please contact us;
6. For more information and CIF price,please contact us;