Price List

Hunan Great Steel Pipe Co., Ltd
steel pipe supplier,square galvanized pipe,dsaw steel pipe

API 5LASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE Price List

Date: 2024-06-06
API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE Price List Post time: Jun-06-2024 API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE Outside Diameter (mm) Outside Diameter (mm) Outside Diameter (mm) Outside Diameter (mm) Outside Diameter (mm) Outside Diameter (mm) Outside Diameter (mm) Outside Diameter (mm) FOB TIANJIN USD/TON FOB TIANJIN USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 750 743 750 736 736 736 736 736 Thickness 9.53 743 729 736 715 715 715 715 715 (mm) 10 708 695 702 715 715 715 715 715 12 708 695 702 715 715 715 715 715 14 708 695 702 715 715 715 715 715 16 708 708 715 702 702 702 702 702 18 / 777 715 702 702 702 702 702 20 / / 715 702 702 702 702 702 22 / / 715 702 702 702 702 702 24 / / 715 702 702 702 702 702 26 / / 715 702 702 702 702 28 / / 24 702 702 702 702 30 / / 702 702 702 702 32 / / 715 715 715 715 34 / / 715 715 36 / / 715 715 38 / / / / / / / 40 / / / / / / / / Outside Diameter  (mm) Outside Diameter  (mm) Outside Diameter  (mm) Outside Diameter  (mm) Outside Diameter  (mm) Outside Diameter  (mm) Outside Diameter  (mm) Outside Diameter  (mm) FOB TIANJIN USD/TON FOB TIANJIN USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 736 736 743 743 / / / / Thickness 9.53 736 736 736 736 736 785 771 / (mm) 10 715 715 722 722 722 798 798 / 12 715 715 708 708 708 743 798 / 14 715 715 708 708 708 743 798 / 16 702 722 708 708 708 743 791 / 18 702 722 708 708 708 743 791 / 20 702 722 708 708 708 743 791 / 22 702 722 708 708 708 743 791 / 24 702 722 708 708 708 743 791 / 26 702 722 708 708 708 743 791 / 28 688 708 695 695 695 743 791 / 30 688 708 722 722 722 743 791 / 32 702 722 722 722 722 757 798 / 34 702 722 729 729 729 757 798 / 36 702 722 729 729 729 757 798 / 38 702 722 729 729 729 757 798 / 40 / / / / / 757 798 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 4. The above price is only valid during  Sept. 3th-Sept.  10th; 4. The above price is only valid during  Sept. 3th-Sept.  10th; 4. The above price is only valid during  Sept. 3th-Sept.  10th; 4. The above price is only valid during  Sept. 3th-Sept.  10th; 4. The above price is only valid during  Sept. 3th-Sept.  10th; 4. The above price is only valid during  Sept. 3th-Sept.  10th; 4. The above price is only valid during  Sept. 3th-Sept.  10th; 4. The above price is only valid during  Sept. 3th-Sept.  10th; 4. The above price is only valid during  Sept. 3th-Sept.  10th; 4. The above price is only valid during  Sept. 3th-Sept.  10th; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 6. For more information and CIF price,please contact us: sales@hnssd.com 6. For more information and CIF price,please contact us: sales@hnssd.com 6. For more information and CIF price,please contact us: sales@hnssd.com 6. For more information and CIF price,please contact us: sales@hnssd.com 6. For more information and CIF price,please contact us: sales@hnssd.com 6. For more information and CIF price,please contact us: sales@hnssd.com 6. For more information and CIF price,please contact us: sales@hnssd.com 6. For more information and CIF price,please contact us: sales@hnssd.com 6. For more information and CIF price,please contact us: sales@hnssd.com 6. For more information and CIF price,please contact us: sales@hnssd.com

Latest news list

  • coated steel pipe maintenance,coated steel pipe inspection,steel pipe coating repair,steel pipe corrosion protection
    Installing coated steel pipe does not end the corrosion-protection process,Once the pipe is connected to a pipeline,water system,industrial facility,or structural assembly,its coating must continue to protect the steel under actual service conditions,
  • coated steel pipe,steel pipe coating,FBE coated steel pipe,3LPE coated steel pipe,3LPP coated steel pipe
    Selecting the right coating for steel pipe is not simply a matter of choosing the thickest or most expensive material,In practice,coating selection means choosing a complete protection system that matches the pipe's service environment,operating temperature,installation conditions,corrosion risk,and applicable project specification,
  • coated steel pipe,coated steel pipe applications,coated steel pipe benefits,coated carbon steel pipe
    Industrial piping is often exposed to conditions that can accelerate corrosion,including moisture,soil,chemicals,salts,and outdoor environments,For many projects,using bare carbon steel without additional protection can increase maintenance requirements and shorten the expected service life of the piping system,
  • coated steel pipe procurement,how to buy coated steel pipe,coated steel pipe inspection,coated steel pipe
    Buying coated steel pipe is not simply a matter of comparing prices and selecting a pipe diameter,For an engineering project,the steel pipe,coating system,service environment,inspection requirements,and delivery conditions must all work together,A coating that is suitable for one pipeline may not be appropriate for another,Similarly,a technically compliant pipe can still create problems if the coating is poorly applied,damaged during transportation,or supplied without adequate inspection records,For procurement teams,checking the following points before placing an order can help reduce technical risk and avoid unexpected costs,
  • API 5L X52 seamless pipe,3LPE coated steel pipe,coated carbon steel pipe,API 5L steel pipe
    Reliable pipeline construction depends on more than simply supplying steel pipe,Material grade,pipe dimensions,manufacturing process,corrosion protection,inspection,and delivery coordination all need to match the project requirements,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.