API 5LASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE 2020-08-25
Date: 2020-08-25
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
Post time: Aug-25-2020
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
219
273
324
356
406
457
508
610
711
762
813
914
Wall Thickness
6
544
544
544
544
544
544
544
544
544
544
544
544
壁厚 (mm)
7
544
544
544
544
544
544
544
544
544
544
544
544
8
544
544
544
544
544
544
544
544
544
544
544
544
9
/
/
544
544
544
544
544
544
544
544
544
544
10
/
/
544
544
544
544
544
544
544
544
544
544
11
/
/
544
544
544
544
544
544
544
544
544
544
12
/
/
544
544
544
544
544
544
544
544
544
544
13
/
/
/
/
/
/
/
551
556
556
556
556
14
/
/
/
/
/
/
/
551
556
556
556
556
15
/
/
/
/
/
/
/
566
16
/
/
/
/
/
/
/
566
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
1016
1067
1118
1168
1219
1321
1422
1524
1626
1727
1829
1930
Wall Thickness
6
542
555
555
555
555
555
555
/
/
/
/
/
壁厚 (mm)
7
542
555
555
555
555
555
555
561
561
/
/
/
8
542
555
555
555
555
555
555
561
561
/
/
/
9
542
555
555
555
555
555
555
561
561
/
/
/
10
542
555
555
555
555
555
555
561
561
/
/
/
11
542
555
555
555
555
555
555
561
561
561
568
568
12
542
555
555
555
555
555
555
561
561
561
568
568
13
555
568
568
568
568
568
568
571
571
571
571
590
14
555
568
568
568
568
568
568
571
571
571
571
590
15
565
578
578
578
578
578
578
584
584
584
584
603
16
565
578
578
578
578
578
578
584
584
584
584
603
17
578
578
578
590
590
628
628
628
18
578
578
578
590
590
628
628
628
19
628
628
20
628
628
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
4. The above price is only valid during August 25th-September 01st;
4. The above price is only valid during August 25th-September 01st;
4. The above price is only valid during August 25th-September 01st;
4. The above price is only valid during August 25th-September 01st;
4. The above price is only valid during August 25th-September 01st;
4. The above price is only valid during August 25th-September 01st;
4. The above price is only valid during August 25th-September 01st;
4. The above price is only valid during August 25th-September 01st;
4. The above price is only valid during August 25th-September 01st;
4. The above price is only valid during August 25th-September 01st;
4. The above price is only valid during August 25th-September 01st;
4. The above price is only valid during August 25th-September 01st;
4. The above price is only valid during August 25th-September 01st;
4. The above price is only valid during August 25th-September 01st;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;