API 5LASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE 2020-09-02
Date: 2020-09-02
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
Post time: Sep-02-2020
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
219
273
324
356
406
457
508
610
711
762
813
914
Wall Thickness
6
564
564
564
564
564
564
564
564
564
564
564
564
壁厚 (mm)
7
564
564
564
564
564
564
564
564
564
564
564
564
8
564
564
564
564
564
564
564
564
564
564
564
564
9
/
/
564
564
564
564
564
564
564
564
564
564
10
/
/
564
564
564
564
564
564
564
564
564
564
11
/
/
564
564
564
564
564
564
564
564
564
564
12
/
/
564
564
564
564
564
564
564
564
564
564
13
/
/
/
/
/
/
/
572
577
577
577
577
14
/
/
/
/
/
/
/
572
577
577
577
577
15
/
/
/
/
/
/
/
587
16
/
/
/
/
/
/
/
587
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
1016
1067
1118
1168
1219
1321
1422
1524
1626
1727
1829
1930
Wall Thickness
6
564
577
577
577
577
577
577
/
/
/
/
/
壁厚 (mm)
7
564
577
577
577
577
577
577
583
583
/
/
/
8
564
577
577
577
577
577
577
583
583
/
/
/
9
564
577
577
577
577
577
577
583
583
/
/
/
10
564
577
577
577
577
577
577
583
583
/
/
/
11
564
577
577
577
577
577
577
583
583
583
590
590
12
564
577
577
577
577
577
577
583
583
583
590
590
13
577
590
590
590
590
590
590
594
594
594
594
613
14
577
590
590
590
590
590
590
594
594
594
594
613
15
587
600
600
600
600
600
600
607
607
607
607
626
16
587
600
600
600
600
600
600
607
607
607
607
626
17
600
600
600
613
613
652
652
652
18
600
600
600
613
613
652
652
652
19
652
652
20
652
652
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;