API 5LASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE 2020-10-25
Date: 2020-10-25
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
Post time: Oct-25-2020
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
219
273
324
356
406
457
508
610
711
762
813
914
Wall Thickness
6
571
571
571
571
571
571
571
571
571
571
571
571
壁厚 (mm)
7
571
571
571
571
571
571
571
571
571
571
571
571
8
571
571
571
571
571
571
571
571
571
571
571
571
9
/
/
571
571
571
571
571
571
571
571
571
571
10
/
/
571
571
571
571
571
571
571
571
571
571
11
/
/
571
571
571
571
571
571
571
571
571
571
12
/
/
571
571
571
571
571
571
571
571
571
571
13
/
/
/
/
/
/
/
579
584
584
584
584
14
/
/
/
/
/
/
/
579
584
584
584
584
15
/
/
/
/
/
/
/
595
16
/
/
/
/
/
/
/
595
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
1016
1067
1118
1168
1219
1321
1422
1524
1626
1727
1829
1930
Wall Thickness
6
571
584
584
584
584
584
584
/
/
/
/
/
壁厚 (mm)
7
571
584
584
584
584
584
584
591
591
/
/
/
8
571
584
584
584
584
584
584
591
591
/
/
/
9
571
584
584
584
584
584
584
591
591
/
/
/
10
571
584
584
584
584
584
584
591
591
/
/
/
11
571
584
584
584
584
584
584
591
591
591
598
598
12
571
584
584
584
584
584
584
591
591
591
598
598
13
584
598
598
598
598
598
598
602
602
602
602
621
14
584
598
598
598
598
598
598
602
602
602
602
621
15
595
608
608
608
608
608
608
615
615
615
615
635
16
595
608
608
608
608
608
608
615
615
615
615
635
17
608
608
608
621
621
661
661
661
18
608
608
608
621
621
661
661
661
19
661
661
20
661
661
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
2. The above price is based on EXW, for FOB/CIF/CFR price
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
4. The above price is only valid during October 25th–Novermber 01st;
4. The above price is only valid during October 25th–Novermber 01st;
4. The above price is only valid during October 25th–Novermber 01st;
4. The above price is only valid during October 25th–Novermber 01st;
4. The above price is only valid during October 25th–Novermber 01st;
4. The above price is only valid during October 25th–Novermber 01st;
4. The above price is only valid during October 25th–Novermber 01st;
4. The above price is only valid during October 25th–Novermber 01st;
4. The above price is only valid during October 25th–Novermber 01st;
4. The above price is only valid during October 25th–Novermber 01st;
4. The above price is only valid during October 25th–Novermber 01st;
4. The above price is only valid during October 25th–Novermber 01st;
4. The above price is only valid during October 25th–Novermber 01st;
4. The above price is only valid during October 25th–Novermber 01st;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;