Company News

Hunan Great Steel Pipe Co., Ltd
dsaw steel pipe,coated carbon pipe,steel pipe manufacturer

API 5LASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE 2021-01-02

Date: 2021-01-02
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE Post time: Jan-02-2021 API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE FOB TIANJIN USD/TON FOB TIANJIN USD/TON Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) FOB TIANJIN USD/TON FOB TIANJIN USD/TON 219 273 324 356 406 457 508 610 711 762 813 914 Wall Thickness 6 672 672 672 672 672 672 672 672 672 672 672 672 壁厚 (mm) 7 672 672 672 672 672 672 672 672 672 672 672 672 8 672 672 672 672 672 672 672 672 672 672 672 672 9 672 672 672 672 672 672 672 672 672 672 10 672 672 672 672 672 672 672 672 672 672 11 672 672 672 672 672 672 672 672 672 672 12 672 672 672 672 672 672 672 672 672 672 13 681 686 686 686 686 14 681 686 686 686 686 15 697 16 697 FOB TIANJIN USD/TON FOB TIANJIN USD/TON Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) FOB TIANJIN USD/TON FOB TIANJIN USD/TON 1016 1067 1118 1168 1219 1321 1422 1524 1626 1727 1829 1930 Wall Thickness 6 672 686 686 686 686 686 686 壁厚 (mm) 7 672 686 686 686 686 686 686 693 693 8 672 686 686 686 686 686 686 693 693 9 672 686 686 686 686 686 686 693 693 10 672 686 686 686 686 686 686 693 693 11 672 686 686 686 686 686 686 693 693 693 700 700 12 672 686 686 686 686 686 686 693 693 693 700 700 13 686 700 700 700 700 700 700 704 704 704 704 724 14 686 700 700 700 700 700 700 704 704 704 704 724 15 697 711 711 711 711 711 711 718 718 718 718 738 16 697 711 711 711 711 711 711 718 718 718 718 738 17 711 711 711 724 724 766 766 766 18 711 711 711 724 724 766 766 766 19 766 766 20 766 766 Note: Note: Note: Note: Note: Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on bare pipes, 12M fixed length; 1. The above price is based on bare pipes, 12M fixed length; 1. The above price is based on bare pipes, 12M fixed length; 1. The above price is based on bare pipes, 12M fixed length; 1. The above price is based on bare pipes, 12M fixed length; 1. The above price is based on bare pipes, 12M fixed length; 1. The above price is based on bare pipes, 12M fixed length; 1. The above price is based on bare pipes, 12M fixed length; 1. The above price is based on bare pipes, 12M fixed length; 1. The above price is based on bare pipes, 12M fixed length; 1. The above price is based on bare pipes, 12M fixed length; 1. The above price is based on bare pipes, 12M fixed length; 1. The above price is based on bare pipes, 12M fixed length; 1. The above price is based on bare pipes, 12M fixed length; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 4. The above price is only valid during Jan. 2nd -Jan. 8th 4. The above price is only valid during Jan. 2nd -Jan. 8th 4. The above price is only valid during Jan. 2nd -Jan. 8th 4. The above price is only valid during Jan. 2nd -Jan. 8th 4. The above price is only valid during Jan. 2nd -Jan. 8th 4. The above price is only valid during Jan. 2nd -Jan. 8th 4. The above price is only valid during Jan. 2nd -Jan. 8th 4. The above price is only valid during Jan. 2nd -Jan. 8th 4. The above price is only valid during Jan. 2nd -Jan. 8th 4. The above price is only valid during Jan. 2nd -Jan. 8th 4. The above price is only valid during Jan. 2nd -Jan. 8th 4. The above price is only valid during Jan. 2nd -Jan. 8th 4. The above price is only valid during Jan. 2nd -Jan. 8th 4. The above price is only valid during Jan. 2nd -Jan. 8th 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,
  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.