API 5LASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE 2021-05-31
Date: 2021-05-31
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
Post time: May-31-2021
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
219
273
324
356
406
457
508
610
711
762
813
914
Wall Thickness
6
914
914
914
914
914
914
914
914
914
914
914
914
壁厚 (mm)
7
914
914
914
914
914
914
914
914
914
914
914
914
8
914
914
914
914
914
914
914
914
914
914
914
914
9
914
914
914
914
914
914
914
914
914
914
10
914
914
914
914
914
914
914
914
914
914
11
914
914
914
914
914
914
914
914
914
914
12
914
914
914
914
914
914
914
914
914
914
13
923
930
930
930
930
14
923
930
930
930
930
15
942
16
942
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
1016
1067
1118
1168
1219
1321
1422
1524
1626
1727
1829
1930
Wall Thickness
6
914
930
930
930
930
930
930
壁厚 (mm)
7
914
930
930
930
930
930
930
938
938
8
914
930
930
930
930
930
930
938
938
9
914
930
930
930
930
930
930
938
938
10
914
930
930
930
930
930
930
938
938
11
914
930
930
930
930
930
930
938
938
938
945
945
12
914
930
930
930
930
930
930
938
938
938
945
945
13
930
945
945
945
945
945
945
950
950
950
950
973
14
930
945
945
945
945
945
945
950
950
950
950
973
15
942
958
958
958
958
958
958
966
966
966
966
989
16
942
958
958
958
958
958
958
966
966
966
966
989
17
958
958
958
973
973
1020
1020
1020
18
958
958
958
973
973
1020
1020
1020
19
1020
1020
20
1020
1020
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
4. The above price is only valid during May 27th-June 3rd;
4. The above price is only valid during May 27th-June 3rd;
4. The above price is only valid during May 27th-June 3rd;
4. The above price is only valid during May 27th-June 3rd;
4. The above price is only valid during May 27th-June 3rd;
4. The above price is only valid during May 27th-June 3rd;
4. The above price is only valid during May 27th-June 3rd;
4. The above price is only valid during May 27th-June 3rd;
4. The above price is only valid during May 27th-June 3rd;
4. The above price is only valid during May 27th-June 3rd;
4. The above price is only valid during May 27th-June 3rd;
4. The above price is only valid during May 27th-June 3rd;
4. The above price is only valid during May 27th-June 3rd;
4. The above price is only valid during May 27th-June 3rd;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;