API 5LASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE 2021-09-09
Date: 2021-09-09
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
Post time: Sep-09-2021
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
219
273
324
356
406
457
508
610
711
762
813
914
Wall Thickness
6
1026
1026
1026
1026
1026
1026
1026
1026
1026
1026
1026
1026
壁厚 (mm)
7
1026
1026
1026
1026
1026
1026
1026
1026
1026
1026
1026
1026
8
1026
1026
1026
1026
1026
1026
1026
1026
1026
1026
1026
1026
9
1026
1026
1026
1026
1026
1026
1026
1026
1026
1026
10
1026
1026
1026
1026
1026
1026
1026
1026
1026
1026
11
1026
1026
1026
1026
1026
1026
1026
1026
1026
1026
12
1026
1026
1026
1026
1026
1026
1026
1026
1026
1026
13
1035
1041
1041
1041
1041
14
1035
1041
1041
1041
1041
15
1053
16
1053
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
1016
1067
1118
1168
1219
1321
1422
1524
1626
1727
1829
1930
Wall Thickness
6
1026
1041
1041
1041
1041
1041
1041
壁厚 (mm)
7
1026
1041
1041
1041
1041
1041
1041
1049
1049
8
1026
1041
1041
1041
1041
1041
1041
1049
1049
9
1026
1041
1041
1041
1041
1041
1041
1049
1049
10
1026
1041
1041
1041
1041
1041
1041
1049
1049
11
1026
1041
1041
1041
1041
1041
1041
1049
1049
1049
1057
1057
12
1026
1041
1041
1041
1041
1041
1041
1049
1049
1049
1057
1057
13
1041
1057
1057
1057
1057
1057
1057
1061
1061
1061
1061
1084
14
1041
1057
1057
1057
1057
1057
1057
1061
1061
1061
1061
1084
15
1053
1069
1069
1069
1069
1069
1069
1077
1077
1077
1077
1100
16
1053
1069
1069
1069
1069
1069
1069
1077
1077
1077
1077
1100
17
1069
1069
1069
1084
1084
1131
1131
1131
18
1069
1069
1069
1084
1084
1131
1131
1131
19
1131
1131
20
1131
1131
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
1. The above price is based on BARE pipes;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
4. The above price is only valid during September 9th-16th;
4. The above price is only valid during September 9th-16th;
4. The above price is only valid during September 9th-16th;
4. The above price is only valid during September 9th-16th;
4. The above price is only valid during September 9th-16th;
4. The above price is only valid during September 9th-16th;
4. The above price is only valid during September 9th-16th;
4. The above price is only valid during September 9th-16th;
4. The above price is only valid during September 9th-16th;
4. The above price is only valid during September 9th-16th;
4. The above price is only valid during September 9th-16th;
4. The above price is only valid during September 9th-16th;
4. The above price is only valid during September 9th-16th;
4. The above price is only valid during September 9th-16th;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;
6. For more information and CIF price, please contact us;