Industry News

Hunan Great Steel Pipe Co., Ltd
stainless steel pipe supplier,dsaw steel pipe,steel tube supplier

API 5LASTM A53 GR.B (Hot Rolled ERW Steel Pipe)

Date: 2020-12-25
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) Post time: Dec-25-2020 API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) Outside Diameter Wall Thickness FOB TIANJIN Outside Diameter Wall Thickness FOB TIANJIN 外径 (mm) 壁厚 (mm) 离港价 USD/TON 外径 (mm) 壁厚 (mm) 离港价 USD/TON 219、245 5.0-11.75 647.93 426 5.75-11.75 668.29 273 5.0-11.75 647.93 426 12.5-13.75 675.07 273 12.5-13.75 654.71 457、478 5.75-11.75 681.86 299 5.5-11.75 647.93 457、478 12.5-13.75 688.65 299 12.5-13.75 654.71 457、478 14.5-17.75 695.43 325 5.5-11.75 647.93 508 5.75-11.75 681.86 325 12.5-13.75 654.71 508 12.5-13.75 688.65 355 5.5-11.75 668.29 508 14.5-17.75 695.43 355 12.5-13.75 675.07 529/559/610/630 5.75-11.75 695.43 377 5.75-11.75 668.29 529/559/610/630 12.5-13.75 702.22 377 12.5-13.75 675.07 529/559/610/630 14.5-17.75 709.01 406 5.75-11.75 668.29 660 7.5-11.75 715.79 406 12.5-13.75 675.07 660 12.5-13.75 722.58 406 / / 660 14.5-17.75 729.37 Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valide during 2020 December 25th–2021 January 02nd; 4. The above price is only valide during 2020 December 25th–2021 January 02nd; 4. The above price is only valide during 2020 December 25th–2021 January 02nd; 4. The above price is only valide during 2020 December 25th–2021 January 02nd; 4. The above price is only valide during 2020 December 25th–2021 January 02nd; 4. The above price is only valide during 2020 December 25th–2021 January 02nd; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • FBE coated steel pipe inspection and maintenance,FBE pipeline maintenance,steel pipe coating inspection,FBE coating defects
    FBE (fusion-bonded epoxy) coating provides external corrosion protection for steel pipelines,particularly in buried and submerged applications,However,the coating does not eliminate the need for inspection after installation,Construction damage,field joint defects,ground movement and third-party excavation can affect the protective system during pipeline service,For buried pipelines,most of the external coating cannot be examined directly without excavation,Operators therefore need a planned integrity management approach that combines construction records,accessible-area inspections,corrosion monitoring and targeted investigation of suspected defects,
  • FBE steel pipe export supply,FBE steel pipe export,FBE pipe shipment,international steel pipe supplier
    Exporting FBE coated steel pipes for an overseas pipeline project involves more than arranging production and booking shipment,The order must move through several connected stages,from technical specification review and pipe sourcing to coating coordination,inspection,documentation and delivery,Each stage needs to follow the approved purchase requirements,A mismatch in pipe specifications,coating details,inspection records or shipping documents can delay acceptance and affect the project schedule,A clear coordination process helps buyers maintain control over these details before the goods leave the country of origin,
  • prevent FBE steel pipe coating,FBE pipe handling,FBE coated pipe transportation,FBE coating repair,FBE steel pipe coating inspection
    Fusion-bonded epoxy (FBE) coating provides external corrosion protection for steel pipes used in steel pipeline systems,However,even a properly applied coating can be damaged after leaving the coating facility,Scratches,impact marks,and abrasion may occur during lifting,transportation,storage,or installation,potentially exposing the steel surface to corrosion,Preventing this damage requires more than careful handling at one stage,Protection should be considered throughout the supply and construction process,from loading and delivery to trench installation and final inspection,
  • buying FBE steel pipe internationally,FBE steel pipe supplier,FBE coated pipe procurement,FBE pipe export purchasing
    Buying FBE coated steel pipe from an overseas supplier involves more than comparing prices,Buyers need to confirm the base pipe specifications,coating requirements,inspection arrangements,shipping terms and delivery schedule before placing an order,A low quotation may not represent the best value if important technical requirements or destination costs have been left out,
  • FBE steel pipe field joint coating,FBE pipe welding protection,field joint coating,FBE coating repair,FBE field joint inspection
    FBE (fusion-bonded epoxy) coating provides external corrosion protection for steel pipes used in pipeline projects,However,during pipeline construction,the coating near pipe ends must be protected while individual pipe sections are joined by welding,The exposed joint area then requires a suitable field joint coating system,If this work is not properly controlled,damage or poor bonding at the joint can compromise the continuity of the pipeline's corrosion protection,Protecting the factory coating and applying the correct field joint system are therefore important parts of pipeline construction,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.