Company News

Hunan Great Steel Pipe Co., Ltd
galvanized steel pipe,304L stainless steel pipe,seamless pipe

API 5LASTM A53 GR.B (Hot Rolled ERW Steel Pipe) 2020-07-02

Date: 2020-07-02
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) Post time: Jul-02-2020 API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) Outside Diameter Wall Thickness FOB TIANJIN Outside Diameter Wall Thickness FOB TIANJIN 外径 (mm) 壁厚 (mm) 离港价 USD/TON 外径 (mm) 壁厚 (mm) 离港价 USD/TON 219、245 5.0-11.75 528.33 426 5.75-11.75 559.94 273 5.0-11.75 528.33 426 12.5-13.75 566.26 273 12.5-13.75 528.33 457、478 5.75-11.75 566.26 299 5.5-11.75 540.97 457、478 12.5-13.75 572.58 299 12.5-13.75 547.29 457、478 14.5-17.75 578.90 325 5.5-11.75 528.33 508 5.75-11.75 566.26 325 12.5-13.75 534.65 508 12.5-13.75 572.58 355 5.5-11.75 559.94 508 14.5-17.75 578.90 355 12.5-13.75 566.26 529/559/610/630 5.75-11.75 597.86 377 5.75-11.75 559.94 529/559/610/630 12.5-13.75 604.18 377 12.5-13.75 566.26 529/559/610/630 14.5-17.75 610.51 406 5.75-11.75 559.94 660 7.5-11.75 610.51 406 12.5-13.75 566.26 660 12.5-13.75 616.83 406 / / 660 14.5-17.75 623.15 Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valid during July 2nd – July 9th 4. The above price is only valid during July 2nd – July 9th 4. The above price is only valid during July 2nd – July 9th 4. The above price is only valid during July 2nd – July 9th 4. The above price is only valid during July 2nd – July 9th 4. The above price is only valid during July 2nd – July 9th 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,
  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.