API 5LASTM A53 GR.B (Hot Rolled ERW Steel Pipe) 2020-07-28
Date: 2020-07-28
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Post time: Jul-28-2020
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Outside Diameter
Wall Thickness
FOB TIANJIN
Outside Diameter
Wall Thickness
FOB TIANJIN
外径 (mm)
壁厚 (mm)
离港价 USD/TON
外径 (mm)
壁厚 (mm)
离港价 USD/TON
219、245
5.0-11.75
567.53
462
5.75-11.75
592.99
273
5.0-11.75
567.53
462
12.5-13.75
599.36
273
12.5-13.75
573.89
457、478
5.75-11.75
605.73
299
5.5-11.75
580.26
457、478
12.5-13.75
612.09
299
12.5-13.75
586.63
457、478
14.5-17.75
618.46
325
5.5-11.75
567.53
508
5.75-11.75
605.73
325
12.5-13.75
573.89
508
12.5-13.75
612.09
355
5.5-11.75
592.99
508
14.5-17.75
618.46
355
12.5-13.75
599.36
529/559/610/630
5.75-11.75
631.19
377
5.75-11.75
618.46
529/559/610/630
12.5-13.75
637.56
377
12.5-13.75
599.36
529/559/610/630
14.5-17.75
643.93
406
5.75-11.75
592.99
660
7.5-11.75
650.29
406
12.5-13.75
599.36
660
12.5-13.75
656.66
406
/
/
660
14.5-17.75
663.03
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
4. The above price is only valide during March 24-31;
4. The above price is only valide during March 24-31;
4. The above price is only valide during March 24-31;
4. The above price is only valide during March 24-31;
4. The above price is only valide during March 24-31;
4. The above price is only valide during March 24-31;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;