API 5LASTM A53 GR.B (Hot Rolled ERW Steel Pipe) 2020-08-25
Date: 2020-08-25
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Post time: Aug-25-2020
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Outside Diameter
Wall Thickness
FOB TIANJIN
Outside Diameter
Wall Thickness
FOB TIANJIN
外径 (mm)
壁厚 (mm)
离港价 USD/TON
外径 (mm)
壁厚 (mm)
离港价 USD/TON
219、245
5.0-11.75
540.97
426
5.75-11.75
566.26
273
5.0-11.75
540.97
426
12.5-13.75
572.58
273
12.5-13.75
547.29
457、478
5.75-11.75
578.90
299
5.5-11.75
553.62
457、478
12.5-13.75
585.22
299
12.5-13.75
559.94
457、478
14.5-17.75
591.54
325
5.5-11.75
540.97
508
5.75-11.75
578.90
325
12.5-13.75
547.29
508
12.5-13.75
585.22
355
5.5-11.75
566.26
508
14.5-17.75
591.54
355
12.5-13.75
572.58
529/559/610/630
5.75-11.75
604.18
377
5.75-11.75
591.54
529/559/610/630
12.5-13.75
610.51
377
12.5-13.75
572.58
529/559/610/630
14.5-17.75
616.83
406
5.75-11.75
566.26
660
7.5-11.75
623.15
406
12.5-13.75
572.58
660
12.5-13.75
629.47
406
/
/
660
14.5-17.75
635.79
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
4. The above price is only valide during August 25th–Spetember 01st;
4. The above price is only valide during August 25th–Spetember 01st;
4. The above price is only valide during August 25th–Spetember 01st;
4. The above price is only valide during August 25th–Spetember 01st;
4. The above price is only valide during August 25th–Spetember 01st;
4. The above price is only valide during August 25th–Spetember 01st;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;