API 5LASTM A53 GR.B (Hot Rolled ERW Steel Pipe) 2020-09-02
Date: 2020-09-02
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Post time: Sep-02-2020
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Outside Diameter
Wall Thickness
FOB TIANJIN
Outside Diameter
Wall Thickness
FOB TIANJIN
外径 (mm)
壁厚 (mm)
离港价 USD/TON
外径 (mm)
壁厚 (mm)
离港价 USD/TON
219、245
5.0-11.75
555.79
426
5.75-11.75
581.78
273
5.0-11.75
555.79
426
12.5-13.75
588.28
273
12.5-13.75
562.29
457、478
5.75-11.75
594.77
299
5.5-11.75
568.78
457、478
12.5-13.75
601.27
299
12.5-13.75
575.28
457、478
14.5-17.75
607.77
325
5.5-11.75
555.79
508
5.75-11.75
594.77
325
12.5-13.75
562.29
508
12.5-13.75
601.27
355
5.5-11.75
581.78
508
14.5-17.75
607.77
355
12.5-13.75
588.28
529/559/610/630
5.75-11.75
620.76
377
5.75-11.75
607.77
529/559/610/630
12.5-13.75
627.26
377
12.5-13.75
588.28
529/559/610/630
14.5-17.75
633.76
406
5.75-11.75
581.78
660
7.5-11.75
640.25
406
12.5-13.75
588.28
660
12.5-13.75
646.75
406
/
/
660
14.5-17.75
653.25
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
4. The above price is only valid during September 2nd – July 9th
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;