API 5LASTM A53 GR.B (Hot Rolled ERW Steel Pipe) 2020-09-09
Date: 2020-09-09
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Post time: Sep-09-2020
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Outside Diameter
Wall Thickness
FOB TIANJIN
Outside Diameter
Wall Thickness
FOB TIANJIN
外径 (mm)
壁厚 (mm)
离港价 USD/TON
外径 (mm)
壁厚 (mm)
离港价 USD/TON
219、245
5.0-11.75
592.65
426
5.75-11.75
618.68
273
5.0-11.75
592.65
426
12.5-13.75
625.18
273
12.5-13.75
605.66
457、478
5.75-11.75
631.69
299
5.5-11.75
612.17
457、478
12.5-13.75
638.20
299
12.5-13.75
612.17
457、478
14.5-17.75
644.71
325
5.5-11.75
592.65
508
5.75-11.75
631.69
325
12.5-13.75
599.15
508
12.5-13.75
638.20
355
5.5-11.75
618.68
508
14.5-17.75
644.71
355
12.5-13.75
625.18
529/559/610/630
5.75-11.75
664.23
377
5.75-11.75
618.68
529/559/610/630
12.5-13.75
670.74
377
12.5-13.75
625.18
529/559/610/630
14.5-17.75
677.24
406
5.75-11.75
618.68
660
7.5-11.75
670.74
406
12.5-13.75
625.18
660
12.5-13.75
677.24
406
/
/
660
14.5-17.75
696.76
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
4. The above price is only valide during September 9th–September 16th;
4. The above price is only valide during September 9th–September 16th;
4. The above price is only valide during September 9th–September 16th;
4. The above price is only valide during September 9th–September 16th;
4. The above price is only valide during September 9th–September 16th;
4. The above price is only valide during September 9th–September 16th;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;