API 5LASTM A53 GR.B (Hot Rolled ERW Steel Pipe) 2020-10-19
Date: 2020-10-19
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Post time: Oct-19-2020
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Outside Diameter
Wall Thickness
FOB TIANJIN
Outside Diameter
Wall Thickness
FOB TIANJIN
外径 (mm)
壁厚 (mm)
离港价 USD/TON
外径 (mm)
壁厚 (mm)
离港价 USD/TON
219、245
5.0-11.75
579.54
462
5.75-11.75
598.96
273
5.0-11.75
579.54
462
12.5-13.75
605.43
273
12.5-13.75
586.01
457、478
5.75-11.75
611.90
299
5.5-11.75
579.54
457、478
12.5-13.75
618.37
299
12.5-13.75
586.01
457、478
14.5-17.75
624.85
325
5.5-11.75
579.54
508
5.75-11.75
611.90
325
12.5-13.75
586.01
508
12.5-13.75
618.37
355
5.5-11.75
598.96
508
14.5-17.75
624.85
355
12.5-13.75
605.43
529/559/610/630
5.75-11.75
624.85
377
5.75-11.75
598.96
529/559/610/630
12.5-13.75
631.32
377
12.5-13.75
605.43
529/559/610/630
14.5-17.75
637.79
406
5.75-11.75
598.96
660
7.5-11.75
644.26
406
12.5-13.75
605.43
660
12.5-13.75
650.73
406
/
/
660
14.5-17.75
657.21
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
1. The above price is based on BARE pipe, for extra coating, please contact us;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
4. The above price is only valide during October 17-24;
4. The above price is only valide during October 17-24;
4. The above price is only valide during October 17-24;
4. The above price is only valide during October 17-24;
4. The above price is only valide during October 17-24;
4. The above price is only valide during October 17-24;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;