API 5LASTM A53 GR.B (Hot Rolled ERW Steel Pipe) 2020-10-25
Date: 2020-10-25
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Post time: Oct-25-2020
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Outside Diameter
Wall Thickness
FOB TIANJIN
Outside Diameter
Wall Thickness
FOB TIANJIN
外径 (mm)
壁厚 (mm)
离港价 USD/TON
外径 (mm)
壁厚 (mm)
离港价 USD/TON
219、245
5.0-11.75
568.92
426
5.75-11.75
588.88
273
5.0-11.75
568.92
426
12.5-13.75
595.53
273
12.5-13.75
575.57
457、478
5.75-11.75
602.19
299
5.5-11.75
568.92
457、478
12.5-13.75
608.84
299
12.5-13.75
575.57
457、478
14.5-17.75
615.50
325
5.5-11.75
568.92
508
5.75-11.75
602.19
325
12.5-13.75
575.57
508
12.5-13.75
608.84
355
5.5-11.75
588.88
508
14.5-17.75
615.50
355
12.5-13.75
595.53
529/559/610/630
5.75-11.75
615.50
377
5.75-11.75
588.88
529/559/610/630
12.5-13.75
622.15
377
12.5-13.75
595.53
529/559/610/630
14.5-17.75
628.80
406
5.75-11.75
588.88
660
7.5-11.75
635.46
406
12.5-13.75
595.53
660
12.5-13.75
642.11
406
/
/
660
14.5-17.75
648.77
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
4. The above price is only valide during October 25th–Novermber 01st;
4. The above price is only valide during October 25th–Novermber 01st;
4. The above price is only valide during October 25th–Novermber 01st;
4. The above price is only valide during October 25th–Novermber 01st;
4. The above price is only valide during October 25th–Novermber 01st;
4. The above price is only valide during October 25th–Novermber 01st;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;