API 5LASTM A53 GR.B (Hot Rolled ERW Steel Pipe) 2020-11-02
Date: 2020-11-02
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Post time: Nov-02-2020
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Outside Diameter
Wall Thickness
FOB TIANJIN
Outside Diameter
Wall Thickness
FOB TIANJIN
外径 (mm)
壁厚 (mm)
离港价 USD/TON
外径 (mm)
壁厚 (mm)
离港价 USD/TON
219、245
5.0-11.75
580.51
426
5.75-11.75
600.41
273
5.0-11.75
580.51
426
12.5-13.75
607.05
273
12.5-13.75
587.15
457、478
5.75-11.75
613.68
299
5.5-11.75
580.51
457、478
12.5-13.75
620.31
299
12.5-13.75
587.15
457、478
14.5-17.75
626.95
325
5.5-11.75
580.51
508
5.75-11.75
613.68
325
12.5-13.75
587.15
508
12.5-13.75
620.31
355
5.5-11.75
600.41
508
14.5-17.75
626.95
355
12.5-13.75
607.05
529/559/610/630
5.75-11.75
626.95
377
5.75-11.75
600.41
529/559/610/630
12.5-13.75
633.58
377
12.5-13.75
607.05
529/559/610/630
14.5-17.75
640.22
406
5.75-11.75
600.41
660
7.5-11.75
646.85
406
12.5-13.75
607.05
660
12.5-13.75
653.48
406
/
/
660
14.5-17.75
660.12
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
4. The above price is only valid during Nov. 2nd – Nov. 9th
4. The above price is only valid during Nov. 2nd – Nov. 9th
4. The above price is only valid during Nov. 2nd – Nov. 9th
4. The above price is only valid during Nov. 2nd – Nov. 9th
4. The above price is only valid during Nov. 2nd – Nov. 9th
4. The above price is only valid during Nov. 2nd – Nov. 9th
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;