API 5LASTM A53 GR.B (Hot Rolled ERW Steel Pipe) 2021-01-02
Date: 2021-01-02
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Post time: Jan-02-2021
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Outside Diameter
Wall Thickness
FOB TIANJIN
Outside Diameter
Wall Thickness
FOB TIANJIN
外径 (mm)
壁厚 (mm)
离港价 USD/TON
外径 (mm)
壁厚 (mm)
离港价 USD/TON
219、245
5.0-11.75
649.25
426
5.75-11.75
689.15
273
5.0-11.75
649.25
426
12.5-13.75
696.01
273
12.5-13.75
655.90
457、478
5.75-11.75
702.87
299
5.5-11.75
649.25
457、478
12.5-13.75
709.73
299
12.5-13.75
655.90
457、478
14.5-17.75
716.59
325
5.5-11.75
649.25
508
5.75-11.75
702.87
325
12.5-13.75
655.90
508
12.5-13.75
709.73
355
5.5-11.75
669.22
508
14.5-17.75
716.59
355
12.5-13.75
675.88
529/559/610/630
5.75-11.75
716.59
377
5.75-11.75
669.22
529/559/610/630
12.5-13.75
723.45
377
12.5-13.75
675.88
529/559/610/630
14.5-17.75
730.31
406
5.75-11.75
669.22
660
7.5-11.75
737.17
406
12.5-13.75
675.88
660
12.5-13.75
744.03
406
/
/
660
14.5-17.75
750.89
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
4. The above price is only valid during Jan. 2nd – Jan. 8th
4. The above price is only valid during Jan. 2nd – Jan. 8th
4. The above price is only valid during Jan. 2nd – Jan. 8th
4. The above price is only valid during Jan. 2nd – Jan. 8th
4. The above price is only valid during Jan. 2nd – Jan. 8th
4. The above price is only valid during Jan. 2nd – Jan. 8th
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;