API 5LASTM A53 GR.B (Hot Rolled ERW Steel Pipe) 2021-01-09
Date: 2021-01-09
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Post time: Jan-09-2021
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Outside Diameter
Wall Thickness
FOB TIANJIN
Outside Diameter
Wall Thickness
FOB TIANJIN
外径 (mm)
壁厚 (mm)
离港价 USD/TON
外径 (mm)
壁厚 (mm)
离港价 USD/TON
219、245
5.0-11.75
707.91
426
5.75-11.75
721.63
273
5.0-11.75
707.91
426
12.5-13.75
728.49
273
12.5-13.75
714.77
457、478
5.75-11.75
735.35
299
5.5-11.75
707.91
457、478
12.5-13.75
742.21
299
12.5-13.75
714.77
457、478
14.5-17.75
749.07
325
5.5-11.75
707.91
508
5.75-11.75
735.35
325
12.5-13.75
714.77
508
12.5-13.75
742.21
355
5.5-11.75
728.49
508
14.5-17.75
749.07
355
12.5-13.75
735.35
529/559/610/630
5.75-11.75
749.07
377
5.75-11.75
728.49
529/559/610/630
12.5-13.75
755.93
377
12.5-13.75
735.35
529/559/610/630
14.5-17.75
762.79
406
5.75-11.75
728.49
660
7.5-11.75
769.65
406
12.5-13.75
735.35
660
12.5-13.75
776.51
406
/
/
660
14.5-17.75
783.37
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
3. The above price is NOT including any packing and end processing charge, for detailed quotation;
4. The above price is only valid during Jan. 9th – Jan. 16th
4. The above price is only valid during Jan. 9th – Jan. 16th
4. The above price is only valid during Jan. 9th – Jan. 16th
4. The above price is only valid during Jan. 9th – Jan. 16th
4. The above price is only valid during Jan. 9th – Jan. 16th
4. The above price is only valid during Jan. 9th – Jan. 16th
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;