Company News

Hunan Great Steel Pipe Co., Ltd
A335 alloy steel pipe,casing and tubing,rectangular galvanized steel pipe

API 5LASTM A53 GR.B (Hot Rolled ERW Steel Pipe) Price List

Date: 2024-07-08
API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) Price List Post time: Jul-08-2024 API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) Outside Diameter Wall Thickness FOB TIANJIN Outside Diameter Wall Thickness FOB TIANJIN 外径 (mm) 壁厚 (mm) 离港价 USD/TON 外径 (mm) 壁厚 (mm) 离港价 USD/TON 219、245 5.0-11.75 560.15 462 5.75-11.75 566.91 273 5.0-11.75 560.15 462 12.5-13.75 573.67 273 12.5-13.75 566.91 457、478 5.75-11.75 573.67 299 5.5-11.75 560.15 457、478 12.5-13.75 580.43 299 12.5-13.75 566.91 457、478 14.5-17.75 587.19 325 5.5-11.75 560.15 508 5.75-11.75 573.67 325 12.5-13.75 566.91 508 12.5-13.75 580.43 355 5.5-11.75 566.91 508 14.5-17.75 587.19 355 12.5-13.75 573.67 529/559/610/630 5.75-11.75 607.46 377 5.75-11.75 560.15 529/559/610/630 12.5-13.75 614.22 377 12.5-13.75 566.91 529/559/610/630 14.5-17.75 620.98 406 5.75-11.75 566.91 660 7.5-11.75 614.22 406 12.5-13.75 573.67 660 12.5-13.75 620.98 406 / / 660 14.5-17.75 627.74 Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valide during July 08-15; 4. The above price is only valide during July 08-15; 4. The above price is only valide during July 08-15; 4. The above price is only valide during July 08-15; 4. The above price is only valide during July 08-15; 4. The above price is only valide during July 08-15; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 6. For more information and CIF price, please contact us: sales@hnssd.com 6. For more information and CIF price, please contact us: sales@hnssd.com 6. For more information and CIF price, please contact us: sales@hnssd.com 6. For more information and CIF price, please contact us: sales@hnssd.com 6. For more information and CIF price, please contact us: sales@hnssd.com 6. For more information and CIF price, please contact us: sales@hnssd.com

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.