Price List

Hunan Great Steel Pipe Co., Ltd
erw steel pipe,carbon steel pipe provider,plastic coated steel pipe

API 5LASTM A53 GR.B (Small Diameter ERW Steel Pipe) 2020-08-17

Date: 2020-08-17
API 5L/ASTM A53 GR.B (Small Diameter ERW Steel Pipe) Post time: Aug-17-2020 API 5L/ASTM A53 GR.B (Small Diameter ERW Steel Pipe) API 5L/ASTM A53 GR.B (Small Diameter ERW Steel Pipe) API 5L/ASTM A53 GR.B (Small Diameter ERW Steel Pipe) API 5L/ASTM A53 GR.B (Small Diameter ERW Steel Pipe) API 5L/ASTM A53 GR.B (Small Diameter ERW Steel Pipe) API 5L/ASTM A53 GR.B (Small Diameter ERW Steel Pipe) Outside Diameter Wall Thickness FOB TIANJIN Outside Diameter Wall Thickness FOB TIANJIN 外径 (mm) 壁厚 (mm) 离港价 USD/TON 外径 (mm) 壁厚 (mm) 离港价 USD/TON 33.4 (1″) 2.1-2.4 589.43 Φ133 3.0-5.75 568.06 33.4 (1″) 2.5-3.25 571.83 Φ133 6.0-7.75 576.86 33.4 (1″) 3.5-4.0 580.63 Φ133 8.0-10 599.48 42.3 (1.2″) 2.1-2.4 588.17 Φ139.7 (5″) 3.0-4.5 569.32 42.3 (1.2″) 2.5-3.5 584.40 Φ139.7 (5″) 4.75-5.75 576.86 42.3 (1.2″) 3.75 588.17 Φ139.7 (5″) 6.0-7.75 602.00 42.3 (1.2″) 4.0-5.0 594.46 Φ139.7 (5″) 8.0-10 614.57 48.3 (1.5″) 2.1-2.4 570.57 Φ152 3.0-4.5 576.86 48.3 (1.5″) 2.5-3.25 565.55 Φ152 4.75-5.75 579.37 48.3 (1.5″) 3.5-3.75 579.37 Φ152 6.0-7.75 591.94 48.3 (1.5″) 4.0-4.25 594.46 Φ152 8.0-10.0 613.31 48.3 (1.5″) 4.5-6.0 594.46 Φ159 3.25-6.75 570.57 Φ60.3 (2″) 3.0-4.0 570.57 Φ159 6.8-7.75 574.35 Φ60.3 (2″) 4.25-4.75 583.14 Φ159 8.0-10.0 589.43 Φ60.3 (2″) 5.0-5.75 605.77 Φ159 10.0-11.75 614.57 Ф73 3.0-4.75 585.66 Φ165 3.0-6.0 584.40 Ф73 4.8-5.25 589.43 Φ165 6.25-7.0 590.68 Ф73 5.5-7.0 600.74 Φ165 / / Φ76.1 (2.5″) 3.0-4.0 566.80 Φ165 / / Φ76.1 (2.5″) 4.25-4.75 568.06 Φ168.3 3.5-5.75 575.60 Φ76.1 (2.5″) 5.0-5.25 574.35 Φ168.3 6.0-8 581.89 Φ76.1 (2.5″) 5.5-7.0 591.94 Φ168.3 8.25-8.75 589.43 Φ88.9 (3″) 3.0-4.0 565.55 Φ168.3 9.0-9.75 598.23 Φ88.9 (3″) 4.25-4.75 568.06 Φ168.3 10.0-11.75 622.11 Φ88.9 (3″) 5.0-5.25 574.35 Φ168.3 / / Φ88.9 (3″) 5.5-6.0 594.46 Φ177.8 (Φ180) 3.75-5.75 569.32 Φ88.9 (3″) 8 619.59 Φ177.8 (Φ180) 6.0-7.75 575.60 Φ108 3.0-4.5 560.52 Φ177.8 (Φ180) 8.0-8.75 583.14 Φ108 4.75-5.75 563.03 Φ177.8 (Φ180) 9.0-9.75 594.46 Φ108 6.0-6.25 583.14 Φ177.8 (Φ180) 10.0-11.75 607.02 Φ108 6.5-9.0 629.65 Φ177.8 (Φ180) / / Φ114.3 (4”) 3.0-4.0 563.03 Φ193.7 4.0-6.75 576.86 Φ114.3 (4”) 4.25-4.75 568.06 Φ193.7 6.8-7.75 581.89 Φ114.3 (4”) 5.0-6.0 575.60 Φ193.7 8.0-9.75 600.74 Φ114.3 (4”) 6.25-7.75 599.48 Φ193.7 10.0-11.75 615.82 Φ114.3 (4”) 8.0-10 644.73 Φ193.7 / / Φ127 3.0-4.75 570.57 Φ203 3.0-6.75 589.43 Φ127 5.0-5.75 578.12 Φ203 6.8-8.0 596.97 Φ127 / / Φ203 8.25-11.75 604.51 Φ127 / / Φ203 / / Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 1. The above price is based on BARE pipe, for extra coating, please contact us; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valide during August 17-23; 4. The above price is only valide during August 17-23; 4. The above price is only valide during August 17-23; 4. The above price is only valide during August 17-23; 4. The above price is only valide during August 17-23; 4. The above price is only valide during August 17-23; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,
  • oil casing manufacturing,API casing production process,oil casing quality control,oil casing threading,API casing inspection
    Oil casing is a critical component of an oil or gas well,Installed inside the wellbore,it supports the well structure and provides a barrier that can be cemented in place to isolate formations,Its performance depends on material properties,dimensional accuracy,connection integrity and compliance with the applicable product specification,For drilling contractors,project engineers and procurement teams,understanding the oil casing manufacturing process helps clarify which production stages and inspection records matter when evaluating a supplier,
  • hollow section inspection,hollow section maintenance,hollow section corrosion,steel structure maintenance
    Steel hollow sections are widely used in buildings,industrial facilities,canopies and other structural applications,Once installed,their condition can change due to weather exposure,coating damage,impact,water accumulation or changes in service conditions,
  • hollow section supply for overseas construction projects,hollow section supplier,square hollow sections,rectangular hollow sections,hollow section export
    International hollow section orders involve more than supplying square or rectangular steel tubes,For overseas construction projects,buyers also need to consider specification compliance,supply coordination,inspection,export documentation,packing and delivery schedules,
  • hollow section service life,hollow section maintenance,hollow section durability,hollow section corrosion control,steel structure
    The service life of square and rectangular hollow section steel structures depends on more than the original steel grade,Environmental exposure,corrosion protection,fabrication quality,loading conditions,and maintenance all influence long-term performance,For building owners,project engineers and maintenance teams,extending service life starts with understanding how these factors interact,Addressing deterioration early can help reduce repair costs,avoid unnecessary downtime and maintain the intended performance of the structure,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.