Industry News

Hunan Great Steel Pipe Co., Ltd
SSAW steel pipe manufacturer,api casing and tubing,casing and tubing

Adjustment and Control of the Position of High Frequency Induction Loop of Straight Seam Steel Tube

Date: 2020-05-11
Adjustment and Control of the Position of High Frequency Induction Loop of Straight Seam Steel Tube Straight seam steel tube excitation frequency is inversely proportional to the square root of capacitance and inductance in the excitation circuit, or proportional to the square root of voltage and current. As long as the capacitance, inductance or voltage and current in the loop are changed, the excitation frequency can be changed to achieve control Purpose of welding temperature. In addition, the welding temperature can also be achieved by adjusting the welding speed. The high frequency induction coil should be as close as possible to the position of the squeeze roller. If the induction ring is far away from the squeeze roller, the effective heating time is longer, the heat affected zone is wider, and the strength of the weld is reduced. On the contrary, the edge of the weld is not heated enough, and the shape is poor after extrusion. The resistor is one or a group of special magnetic rods for welding pipes. The cross-sectional area of the resistor should not be less than 70% of the cross-sectional area of the inner diameter of the steel pipe. Its function is to form an electromagnetic induction loop between the induction ring, the edge of the tube blank weld and the magnetic bar, and generate a proximity effect. The eddy current heat is concentrated near the edge of the tube blank weld seam, and the tube blank edge is heated to the welding temperature. The resistor is dragged in the tube blank with a wire, and its center position should be relatively fixed near the center of the squeeze roller. When starting up, due to the rapid movement of the tube blank, the resistor is greatly worn by the friction of the inner wall of the tube blank, and it needs to be replaced frequently. Post time: May-11-2020

Latest news list

  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,
  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.