Price List

Hunan Great Steel Pipe Co., Ltd
stainless steel pipe,coated steel pipe,tubing pipe

Carbon seamless pipe for build the ship

Date: 2019-12-16
Carbon seamless pipe for build the ship Carbon seamless pipe for build the ship Application Product is designed and manufactured for the boiler, superheater and pressure system of ships. Production Standard,Steel No. CCS 360,410,440,490 DNV Carbon and Carbon Manganese Steel,Alloy Steel LR Carbon and Carbon Manganese Steel,Alloy Steel GL GL-R360,GL-R410,GL-R510 BV 410HB,510HB KR RST138,RST142 ABS ASTM A53 B/C, ASTM A106 B/C, ASTM A179, ASTM A192 NK STPG410 ,STPG510 Delivery Conditions for carbon seamless steel pipe Annealed,Normalized Inspections and tests performed Chemical Composition Inspection, Mechanical Properties Test(Tensile Strength, Yield Strength,,Elongation, Flaring, Flattening,Bending, Hardness, Impact Test ), Sulphur Print Test, Metallographic Structures Inspection, Surface and Dimension Test, Non-destructive Test ,Hydrostatic Test. Surface treatment Oil-dip,varnish,Passivation,Phosphating,Shot Blasting Size Range O.D 16-168.3mm W.T 1.5-15mm Application Product is designed and manufactured for the boiler, superheater and pressure system of ships. Quality Production Standard,Pipe Steel No. CCS 360,410,440,490 DNV Carbon and Carbon Manganese Steel,Alloy Steel LR Carbon and Carbon Manganese Steel,Alloy Steel GL GL-R360,GL-R410,GL-R510 BV 410HB,510HB KR RST138,RST142 ABS ASTM A53 B/C, ASTM A106 B/C, ASTM A179, ASTM A192 NK STPG410 ,STPG510 Pipe Delivery Conditions In bundles ,Annealed,Normalized Inspections and tests performed for the pipe Chemical Composition Inspection, Mechanical Properties Test(Tensile Strength, Yield Strength,,Elongation, Flaring, Flattening,Bending, Hardness, Impact Test ), Sulphur Print Test, Metallographic Structures Inspection, Surface and Dimension Test, Non-destructive Test ,Hydrostatic Test. Surface treatments for the pipe Oil-dip,varnish,Passivation,Phosphating,Shot Blasting Size Range for the pipe O.D 16-406.4.mm W.T 1.5-25mm Steel pipe for the ship building Post time: Dec-16-2019

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.