Company News

Hunan Great Steel Pipe Co., Ltd
3pe coated steel pipe,casing and tubing,alloy steel pipes

Cold Hardening and Hydrogen Embrittlement of ASTM A179 Seamless Tubes

Date: 2019-11-04
Cold Hardening and Hydrogen Embrittlement of ASTM A179 Seamless Tubes In the production process of astm a179 cold drawn seamless steel pipe, there are cold hardening and hydrogen embrittlement phenomenon, which are caused by cold drawn seamless tube cracking the main reason. Analysis of the phenomenon of bursting astm a179 cold drawn seamless pipe is a smaller diameter of the seamless steel pipe through the drawing die for cold forming cold forming, the process route is generally annealing, pickling, drawing. Cold-drawn small diameter seamless steel pipe in the drawing process, sometimes from beginning to end like the same as the cracker bamboo crack phenomenon, we call this phenomenon is cracking. The reasons for cracking are: Effect of work hardening, the steel pipe produces a large amount of plastic deformation during cold drawing, causing significant lattice distortion, which increases the lattice energy and increases the internal energy of the metal, resulting in uneven internal stress of the metal and residual residual stress. This will increase the metal hardness, toughness decreased. The higher the metal hardness, the greater the residual internal stress during cold drawing, the more obvious the work hardening phenomenon. When the residual stress reaches a certain value, the metal will tear along a certain grain interface, the formation of mild steel pipe cracking. The effect of hydrogen embrittlement, in the process of descaling with acid, sulfuric acid and iron react to precipitate hydrogen. Hydrogen penetrates into the steel in the form of atoms or ions to form a solid solution. The effect of hydrogen on the mechanical properties of steel is typical of hydrogen embrittlement. Post time: Nov-04-2019

Latest news list

  • LSAW steel pipe maintenance,LSAW pipe maintenance,LSAW steel pipe inspection,LSAW pipeline maintenance
    Installing a properly specified LSAW steel pipe does not eliminate the need for pipeline maintenance,Once a pipeline enters service,corrosion,coating deterioration,mechanical loading,ground movement,operating changes,and environmental exposure can gradually affect its condition,For large-diameter pipelines,a practical maintenance program should focus on identifying changes early and taking corrective action before a manageable condition develops into an integrity problem,The objective is not simply to inspect the pipe,It is to understand the condition of the complete pipeline system and respond based on evidence,
  • LSAW steel pipe,LSAW steel pipe for high pressure,high-pressure pipeline,LSAW pipe wall thickness
    High-pressure pipeline systems place demanding requirements on pipe material,dimensions,weld integrity,inspection,and operating conditions,For large-diameter pipelines,LSAW steel pipe can be an effective solution because its manufacturing process allows large outside diameters and substantial wall thicknesses to be produced from steel plate,However,selecting LSAW steel pipe for pressure service is not simply a matter of choosing a thicker wall,The pipe specification needs to match the actual design pressure,temperature,fluid,diameter,applicable code,and service environment,
  • LSAW steel pipe corrosion,LSAW steel pipe coating,3PE coated LSAW steel pipe,FBE coated steel pipe
    LSAW steel pipe is widely used for large-diameter water transmission,buried pipelines,and other infrastructure projects where strength,dimensional control,and long-term service reliability are important,However,pipe strength alone does not prevent corrosion,For buried or water pipeline systems,corrosion protection should be considered from material selection and coating through transportation,field welding,installation,and long-term inspection,A coating system should also be selected according to the actual operating environment rather than simply by initial cost,
  • LSAW steel pipe shipment,LSAW steel pipe export,large diameter steel pipe,LSAW pipe inspection
    For a large-diameter LSAW steel pipe project,manufacturing is only one part of the delivery process,The pipe must meet the approved technical specification,pass the required inspections,receive the correct end preparation and surface protection,and reach the port in suitable condition for international transportation,A recent export order provides a practical example of how technical,quality and logistics activities need to work together before shipment,
  • LSAW steel pipe for water transmission,LSAW water pipe,large diameter LSAW steel pipe,LSAW steel pipe coating
    Large-diameter LSAW steel pipe is widely used for water transmission projects where high flow capacity,large diameters and project-specific wall thicknesses are required,Its longitudinal welded construction also allows manufacturers to produce pipe to defined dimensions and mechanical requirements,But selecting the right LSAW pipe is only one part of pipeline reliability,Hydraulic conditions,pressure transients,internal water quality,corrosion protection,field welding and installation all affect long-term performance,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.