Common problems and solutions in the construction of directly buried thermal insulation pipes The direct buried insulation pipe is foamed by chemical reaction of high-function polyether polyol composite material and polymethyl polyphenyl polyisocyanate as raw materials. Directly buried thermal insulation pipes are used for thermal insulation and cold insulation projects of various indoor and outdoor pipes, central heating pipes, central air conditioning pipes, chemical, pharmaceutical and other industrial pipes. Overview Since the birth of polyurethane composite materials in the 1930s, the polyurethane foam insulation pipe has been rapidly developed as an excellent thermal insulation material, and its application range has become more and more extensive. It is widely used in various pipelines such as heating, cooling, oil transportation, and steam transportation. Common problems and solutions in the construction of directly buried thermal insulation pipes This phenomenon generally occurs in autumn and winter or in the morning construction, because the temperature suddenly drops or the temperature is low. It can be solved by increasing the ambient temperature and the temperature of the black material. Generally, the temperature of the black material is raised to 30-60°C, and the ambient temperature is raised to 20-30°C. This phenomenon generally occurs in spring and summer or during construction at noon, because the temperature suddenly rises and the temperature is too high. The black material can be cooled with cold water or placed outdoors at night for natural cooling to avoid direct sunlight. The foam strength of the directly buried insulation pipe is small and the foam is softer. This phenomenon is caused by the imbalance of the ratio of black and white materials. The proportion of black materials can be appropriately increased (1:1-1.05). Be careful not to make the proportion of black materials too large, otherwise, it will cause The foam becomes brittle, which also affects the performance of the foam. Direct buried insulation pipe has become a relatively mature advanced technology in some developed countries abroad. In the past ten years, my country’s heating engineering and technical personnel are promoting the development of domestic pipe network laying technology to a higher level by digesting and absorbing this advanced technology. The practical results over the past ten years have fully proved that the laying method of directly buried thermal insulation pipeline has many advantages compared with the traditional trench and overhead laying. The direct-buried thermal insulation pipe is closely combined with the steel pipe for conveying the medium, the high-density polyethylene outer casing, and the rigid polyurethane foam insulation layer between the steel pipe and the outer casing. This is also the internal driving force for the rapid development of polyurethane thermal insulation direct buried pipes in my country’s heating engineering. Post time: Oct-17-2022

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,