Industry News

Hunan Great Steel Pipe Co., Ltd
dsaw steel pipe,steel tube manufacturer,coated steel pipe

Galvanized mild steel welded seam welding proces

Date: 2019-10-18
Galvanized mild steel welded seam welding proces Steel surface coating is designed to corrosion or decorative, or both. The seam welding, not only to obtain a sufficient joint strength,but also required to maintain the function of the coating. By the strength requirements, seam welding process and uncoated steel is similar, taking into account the requirements of the coating, welding process parameters shall make the necessary adjustments, then pay attention to the impact of contact resistance coating, allowing the electrode indentation, coating and mother wood and metal alloys tendency to form adhesions occur with electrodes. Galvanized steel pipe is to increase the corrosion resistance of steel, but after galvanized mild steel is more difficult than not galvanized steel plate welding. Mainly due to the low melting point of the zinc coating (about 419C), during welding galvanized layer is first melted and the roller member and the welding electrode and the welding member and the contact surface of the welding current distribution member, the contact area increases, the current density decreases and the contact surface of the electrode and weldments galvanized layer melts, and the electrode face bonding, the copper electrode alloying (CuZn), its electrical conductivity, thermal performance deterioration. The boiling point of zinc 906C, when the temperature exceeds this temperature, the evaporation of zinc. The formation of pores or cracks in the nugget, the heat affected zone is diffused into the connector causes embrittlement cracks may be under pressure. Tests showed that the smaller the penetration rate (10 – 26%), fewer crack defects; welding speed is high, the cooling conditions are poor, hot surface and deep penetration, is easy to crack. Therefore, ensuring the nugget diameter and joint strength conditions, should try to use a small current, low welding speed and a strong external cooling. Electrodes should be used for embossing roller drum drive, in order to keep the tube round trim and clean the surface electrode size. Post time: Oct-18-2019

Latest news list

  • honed tube,precision honed tube,honed steel tube,DOM honed tube,seamless honed tube,honing process
    Hydraulic cylinder failures are often blamed on seals or hydraulic oil,but the condition of the cylinder bore is just as important,Even a small variation in bore accuracy can increase friction,shorten seal life,and reduce overall system efficiency,A honed tube is designed to solve these challenges,Through precision honing,the internal surface of the steel tube achieves strict dimensional accuracy and a controlled cross-hatch finish,allowing pistons and seals to operate smoothly under high pressure and repeated movement,With years of experience supplying hydraulic cylinder tubes and precision steel tubing for construction machinery,mining equipment,and industrial applications,Hunan Great Steel Pipe Co,,Ltd,provides customized honed tube solutions focused on dimensional accuracy,material reliability,and consistent quality,
  • honed tube,honed steel tube,precision honed tube,honed tubing,seamless honed tube,DOM honed tube
    Hydraulic cylinders are only as reliable as the tubes they are built from,Even a high-quality piston seal cannot perform properly if the cylinder bore has poor roundness,excessive roughness,or inconsistent dimensions,These seemingly small imperfections can lead to oil leakage,increased friction,and premature component wear,
  • Studded tube inspection,studded tube quality control,stud welding inspection,heat exchanger tube inspection
    A studded tube may appear to be a simple heat exchanger component,but its long-term performance depends on dozens of manufacturing details,Material traceability,stud welding quality,dimensional accuracy,and inspection records all influence whether the tube will operate reliably in high-temperature service,
  • studded tube,studded tube heat exchanger,heat exchanger tube,studded tube applications,waste heat recovery tube
    In gas-side heat exchangers,the greatest challenge is often not the tube material itself but the relatively low heat transfer coefficient of hot gases,Engineers must improve thermal efficiency without compromising mechanical strength or increasing maintenance requirements,
  • shipment news,project order,export supply,reliable manufacturer,heat exchanger steel tube,studded tube
    We recently completed the shipment of a customized order of heat exchanger steel tubes and studded tubes for an overseas industrial project,Manufactured according to the customer's technical specifications,the products underwent comprehensive quality inspections before export to support reliable installation and long-term operation,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.