Company News

Hunan Great Steel Pipe Co., Ltd
steel tube supplier,coated carbon pipe,erw pipe

How to store SSAW pipe correctly

Date: 2020-04-10
How to store SSAW pipe correctly? 1. The site or warehouse where the spiral steel pipe products are stored should be selected in a clean and well-drained place, away from factories and mines that generate harmful gases or dust. Weeds and all debris should be removed on the site, and the steel should be kept clean. 2. Spiral steel pipes must not be stacked with materials that are corrosive to steel such as acids, alkalis, salts, and cement in the warehouse. Different types of steel should be stacked separately to prevent confusion and prevent contact corrosion. 3. Large sections, steel rails, shame steel plates, large-caliber steel pipes, forgings, etc. can be stacked in the open air. 4. all and medium-sized steel, wire rods, steel bars, medium-caliber steel pipes, steel wires and wire ropes, etc., can be stored in well-ventilated sheds, but must be underplayed. 5. Some small steels, thin steel plates, steel strips, silicon steel sheets, small-caliber or thin-walled steel pipes, various cold-rolled and cold-drawn steels, and expensive and easily corroded metal products can be stored in the warehouse. 6. Spiral steel pipe warehouses should be selected according to geographical conditions. Generally, general closed warehouses are used, that is, warehouses with roofs and walls, tight doors and windows, and ventilation facilities. 7. Treasury requires ventilation in sunny days, close moisture-proof in rainy days, and often maintain a suitable storage environment. Post time: Apr-10-2020

Latest news list

  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,
  • oil casing export,oil casing shipment,oil casing inspection,oilfield project procurement,oil casing delivery
    Supplying oil casing for an overseas drilling project involves more than arranging shipment,Product specifications,connection requirements,inspection records,packing and delivery schedules must align with the purchase order and project requirements,
  • oil casing service life,oil casing integrity management,oil casing corrosion,oil casing wear,oil casing maintenance
    Oil casing must withstand mechanical loads,pressure changes,temperature variations and potentially corrosive well fluids throughout its service life,Its long-term performance depends not only on the casing grade selected at procurement,but also on well design,operating conditions and integrity management,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.