Company News

Hunan Great Steel Pipe Co., Ltd
api tubing,carbon steel pipe,A335 alloy steel pipe

Key points of production process of spiral welded pipe

Date: 2023-08-24
Key points of production process of spiral welded pipe Spiral welded pipe (SSAW pipe) is a kind of spiral seam steel pipe made of strip steel coil as raw material, which is welded by automatic double-wire double-sided submerged arc welding process and extruded at room temperature. Water supply engineering, petrochemical industry, chemical industry, electric power industry, agricultural irrigation and urban construction are the fields where spiral welded pipes are mainly used. The main process characteristics of spiral welded pipe: 1. During the molding process, the residual stress is small and there is no scratch on the surface. The processed spiral welded pipe has incomparable advantages in the size and specification range of diameter and wall thickness, and can meet more requirements of users for spiral steel pipe specifications. 2. Adopt advanced double-sided submerged arc welding technology to deal with some defects, and it is easy to control the welding quality. 3. Carry out 100% quality inspection on the steel pipe, so as to guarantee the product quality. 4. All equipment in the entire production line has the function of networking with the computer data acquisition system to realize real-time data transmission, and the technical parameters in the production process are controlled by the control room. For the heating process, heat treatment heating equipment and heating medium should be selected. What happens or is easy to happen here is that the surface of the part will be affected by the oxidizing heating medium, and the heating temperature exceeds the process requirements. If the austenite grains are too thick, even the grain boundaries will melt, which will seriously affect the appearance and internal quality of the parts. Therefore, in the actual process, feasible measures should be taken to analyze such defects. The defective parts produced during tempering are quenched to obtain a quenched martensite structure with high hardness or a lower bainite structure with a slightly lower hardness, but the structure is unstable and brittle. When used in production, it is tempered to obtain the desired structure and properties. Therefore, tempering process parameters will have an important impact on the heat treatment quality of parts, such as hardness, tempering brittleness, tempering cracks and other defects, and measures should be taken to avoid these defects during tempering. The correct heat treatment process is the premise and basis for ensuring the qualified heat treatment quality of parts. Once the above quality problems are found, they can be solved from the aspects of people, machines, materials, methods, links, inspections, etc. Through analysis and judgment, the root cause of the defect can be found. Storage skills of spiral welded pipe: 1. The storage place or warehouse of spiral steel pipe products should be located in a clean and well-drained place. Weeds and all sundries should be cleaned up. The steel bars should be kept clean and away from factories and mines that produce harmful gases or dust. 2. Materials that corrode steel such as acid, alkali, salt, and cement shall not be stacked in the warehouse, and steel of different types shall be stacked separately. Prevent confusion and contact corrosion. 3. Small and medium-sized section steel, wire rod, steel bar, medium-diameter steel pipe, steel wire and wire rope, etc. After laying and cushioning, it can be stored in a well-ventilated shed. 4. Small steel, thin steel plate, steel strip, silicon steel sheet or thin-walled spiral steel pipe can be stored. A variety of high-value, corrosive cold-rolled and cold-drawn steel and metal products can be stored. Post time: Aug-24-2023

Latest news list

  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,
  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.