Key points of production process of spiral welded pipe Spiral welded pipe (SSAW pipe) is a kind of spiral seam steel pipe made of strip steel coil as raw material, which is welded by automatic double-wire double-sided submerged arc welding process and extruded at room temperature. Water supply engineering, petrochemical industry, chemical industry, electric power industry, agricultural irrigation and urban construction are the fields where spiral welded pipes are mainly used. The main process characteristics of spiral welded pipe: 1. During the molding process, the residual stress is small and there is no scratch on the surface. The processed spiral welded pipe has incomparable advantages in the size and specification range of diameter and wall thickness, and can meet more requirements of users for spiral steel pipe specifications. 2. Adopt advanced double-sided submerged arc welding technology to deal with some defects, and it is easy to control the welding quality. 3. Carry out 100% quality inspection on the steel pipe, so as to guarantee the product quality. 4. All equipment in the entire production line has the function of networking with the computer data acquisition system to realize real-time data transmission, and the technical parameters in the production process are controlled by the control room. For the heating process, heat treatment heating equipment and heating medium should be selected. What happens or is easy to happen here is that the surface of the part will be affected by the oxidizing heating medium, and the heating temperature exceeds the process requirements. If the austenite grains are too thick, even the grain boundaries will melt, which will seriously affect the appearance and internal quality of the parts. Therefore, in the actual process, feasible measures should be taken to analyze such defects. The defective parts produced during tempering are quenched to obtain a quenched martensite structure with high hardness or a lower bainite structure with a slightly lower hardness, but the structure is unstable and brittle. When used in production, it is tempered to obtain the desired structure and properties. Therefore, tempering process parameters will have an important impact on the heat treatment quality of parts, such as hardness, tempering brittleness, tempering cracks and other defects, and measures should be taken to avoid these defects during tempering. The correct heat treatment process is the premise and basis for ensuring the qualified heat treatment quality of parts. Once the above quality problems are found, they can be solved from the aspects of people, machines, materials, methods, links, inspections, etc. Through analysis and judgment, the root cause of the defect can be found. Storage skills of spiral welded pipe: 1. The storage place or warehouse of spiral steel pipe products should be located in a clean and well-drained place. Weeds and all sundries should be cleaned up. The steel bars should be kept clean and away from factories and mines that produce harmful gases or dust. 2. Materials that corrode steel such as acid, alkali, salt, and cement shall not be stacked in the warehouse, and steel of different types shall be stacked separately. Prevent confusion and contact corrosion. 3. Small and medium-sized section steel, wire rod, steel bar, medium-diameter steel pipe, steel wire and wire rope, etc. After laying and cushioning, it can be stored in a well-ventilated shed. 4. Small steel, thin steel plate, steel strip, silicon steel sheet or thin-walled spiral steel pipe can be stored. A variety of high-value, corrosive cold-rolled and cold-drawn steel and metal products can be stored. Post time: Aug-24-2023

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,