Industry News

Hunan Great Steel Pipe Co., Ltd
spiral welded pipe,alloy steel seamless pipes,oil tubing

LARGE DIAMETER COATED STEEL PIPE

Date: 2023-11-10
LARGE DIAMETER COATED STEEL PIPE Coated steel pipe is manufactured by coating plastic based on large-diameter spiral welded pipe and high-frequency welded pipe. The maximum pipe diameter is 1200mm. Polyvinyl chloride (PVC), polyethylene (PE), epoxy can be coated depending on different needs. Resin (EPOZY) and other plastic coatings with different properties, good adhesion, strong corrosion-resistance, resistant to strong acids, strong alkalis and other chemical corrosion, non-toxic, non-corrosive, wear-resistant, impact-resistant, and strong penetration resistance, The surface of the pipeline is smooth and does not adhere to any substance, which can reduce the resistance during transportation, increase the flow rate and transportation efficiency, and reduce the pressure loss of transportation. There is no solvent and no exudate substance in the coating, so it will not pollute the conveyed medium, to ensure the purity and sanitation of the fluid. It can be used alternately with cold and hot cycles in the range of -40℃ to +80℃, without aging, It does not crack, so it can be used in harsh environments such as cold regions.  Post time: Nov-10-2023

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.