Industry News

Hunan Great Steel Pipe Co., Ltd
straight seam welded pipe,galvanized pipe,api 51 line pipe

LSAW Steel Pipe Price 22nd July 2021

Date: 2021-07-23
LSAW Steel Pipe Price 22nd July 2021 Post time: Jul-23-2021 API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 986 978 986 971 971 971 971 971 Thickness 9.53 978 963 971 948 948 948 948 948 壁厚 (mm) 10 940 925 932 948 948 948 948 948 12 940 925 932 948 948 948 948 948 14 940 925 932 948 948 948 948 948 16 940 940 948 932 932 932 932 932 18 / 947 948 932 932 932 932 932 20 / / 948 932 932 932 932 932 22 / / 948 932 932 932 932 932 24 / / 948 932 932 932 932 932 26 / / / 948 932 932 932 932 28 / / / / 932 932 932 932 30 / / / / 932 932 932 932 32 / / / / 948 948 948 948 34 / / / / / / 948 948 36 / / / / / / 948 948 38 / / / / / / / / 40 / / / / / / / / FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 1033 1033 1041 1041 / Thickness 9.53 1033 1033 1033 1033 1033 1088 1072 / 壁厚 (mm) 10 1009 1009 1017 1017 1017 1103 1103 / 12 1009 1009 1002 1002 1002 1041 1103 / 14 1009 1009 1002 1002 1002 1041 1103 / 16 994 1017 1002 1002 1002 1041 1095 / 18 994 1017 1002 1002 1002 1041 1095 / 20 994 1017 1002 1002 1002 1041 1095 / 22 994 1017 1002 1002 1002 1041 1095 / 24 994 1017 1002 1002 1002 1041 1095 / 26 994 1017 1002 1002 1002 1041 1095 / 28 978 1002 986 986 986 1041 1095 / 30 978 1002 1017 1017 1017 1041 1095 / 32 994 1017 1017 1017 1017 1056 1103 / 34 994 1017 1025 1025 1025 1056 1103 / 36 994 1017 1025 1025 1025 1056 1103 / 38 994 1017 1025 1025 1025 1056 1103 / 40 / / / / / 1056 1103 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 4. The above price is only valid during July 22th-29th 4. The above price is only valid during July 22th-29th 4. The above price is only valid during July 22th-29th 4. The above price is only valid during July 22th-29th 4. The above price is only valid during July 22th-29th 4. The above price is only valid during July 22th-29th 4. The above price is only valid during July 22th-29th 4. The above price is only valid during July 22th-29th 4. The above price is only valid during July 22th-29th 4. The above price is only valid during July 22th-29th 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us;

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.