Price List

Hunan Great Steel Pipe Co., Ltd
stainless steel pipe supplier,seamless steel pipe,anti-corrosion steel pipe

LSAW Steel Pipe Price June 16th 2021

Date: 2021-06-18
LSAW Steel Pipe Price June 16th 2021 Post time: Jun-18-2021 API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 1,082 1,075 1,082 1,067 1,067 1,067 1,067 1,067 Thickness 9.53 1,075 1,059 1,067 1,043 1,043 1,043 1,043 1,043 壁厚 (mm) 10 1,035 1,019 1,027 1,043 1,043 1,043 1,043 1,043 12 1,035 1,019 1,027 1,043 1,043 1,043 1,043 1,043 14 1,035 1,019 1,027 1,043 1,043 1,043 1,043 1,043 16 1,035 1,035 1,043 1,027 1,027 1,027 1,027 1,027 18 / 1,035 1,043 1,027 1,027 1,027 1,027 1,027 20 / / 1,043 1,027 1,027 1,027 1,027 1,027 22 / / 1,043 1,027 1,027 1,027 1,027 1,027 24 / / 1,043 1,027 1,027 1,027 1,027 1,027 26 / / / 1,043 1,027 1,027 1,027 1,027 28 / / / / 1,027 1,027 1,027 1,027 30 / / / / 1,027 1,027 1,027 1,027 32 / / / / 1,043 1,043 1,043 1,043 34 / / / / / / 1,043 1,043 36 / / / / / / 1,043 1,043 38 / / / / / / / / 40 / / / / / / / / FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 1067 1067 1075 1075 / / / / Thickness 9.53 1067 1067 1067 1067 1067 1122 1106 / 壁厚 (mm) 10 1043 1043 1051 1051 1051 1138 1138 / 12 1043 1043 1035 1035 1035 1075 1138 / 14 1043 1043 1035 1035 1035 1075 1138 / 16 1027 1051 1035 1035 1035 1075 1130 / 18 1027 1051 1035 1035 1035 1075 1130 / 20 1027 1051 1035 1035 1035 1075 1130 / 22 1027 1051 1035 1035 1035 1075 1130 / 24 1027 1051 1035 1035 1035 1075 1130 / 26 1027 1051 1035 1035 1035 1075 1130 / 28 1012 1035 1019 1019 1019 1075 1130 / 30 1012 1035 1051 1051 1051 1075 1130 / 32 1027 1051 1051 1051 1051 1090 1138 / 34 1027 1051 1059 1059 1059 1090 1138 / 36 1027 1051 1059 1059 1059 1090 1138 / 38 1027 1051 1059 1059 1059 1090 1138 / 40 / / / / / 1090 1138 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 4. The above price is only valid during June.17-June.24th; 4. The above price is only valid during June.17-June.24th; 4. The above price is only valid during June.17-June.24th; 4. The above price is only valid during June.17-June.24th; 4. The above price is only valid during June.17-June.24th; 4. The above price is only valid during June.17-June.24th; 4. The above price is only valid during June.17-June.24th; 4. The above price is only valid during June.17-June.24th; 4. The above price is only valid during June.17-June.24th; 4. The above price is only valid during June.17-June.24th; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us;

Latest news list

  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,
  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.