Precautions for Purchasing Large Diameter Straight Seam Steel Pipes

Date: 2022-07-22
Precautions for Purchasing Large Diameter Straight Seam Steel Pipes Before purchasing large-diameter straight seam steel pipes (LSAW), you should follow the pre-designed specifications, lengths, materials, wall thicknesses, welding standards and weld requirements, which must be communicated well before purchasing. 1. The first is the specification. For example, 800mm is also called DN800, including 820mm and 813mm of A and B series, or the outer diameter of 800mm must be clearly required to avoid unnecessary losses. 2. The wall thickness of large-diameter straight seam steel pipe is required to be 16mm. It is possible that the actual thickness of the raw materials will be 15.75mm and 16.2mm, and there will be upper or lower differences. These are normal deviations. Because straight seam steel pipes are all ton prices, it is necessary to communicate in advance to avoid differences in weight. 3. The normal length of the large-diameter straight seam steel pipe is 12m. When it needs to be fixed, it needs to be communicated in advance, because the price of the fixed length will be more expensive. If it is not communicated in advance, it will be 9.87m long, and the manufacturer generally gives 9.9m directly. 4. The materials for purchasing large-diameter straight seam steel pipes should also be communicated well, and the materials should not be OEM. In addition, the materials should be guaranteed, and the original material list of the steel mill should be provided. Any material problems will be returned and compensated. 5. The welding standard for production and processing must be in accordance with automatic submerged arc welding LSAW GB/T3091-2015, and a product quality certificate is required. If the standard does not meet the requirements, the product fails. 6. When purchasing large-diameter straight seam steel pipes, it is required to communicate in advance about the level of weld flaw detection, because weld flaw detection will cost extra money. trouble. 7. In addition, large-diameter straight seam steel pipes above 1020mm may produce two welds. Many projects will not accept two welds without prior communication, and will be called defective steel pipes. Therefore, it is necessary to communicate well in advance before purchasing any steel pipe, causing unnecessary disputes and economic losses. Post time: Jul-22-2022

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.