Industry News

Hunan Great Steel Pipe Co., Ltd
api 51 line pipe,straight seam welded pipe,seamless pipe

Price List for Hot Rolled ERW Steel Pipe 01-14-2020

Date: 2020-01-14
Price List for Hot Rolled ERW Steel Pipe 01-14-2020 Post time: Jan-14-2020 API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe) Outside Diameter Wall Thickness FOB TIANJIN FOB TIANJIN Outside Diameter Wall Thickness FOB TIANJIN FOB TIANJIN 外径 (mm) 壁厚 (mm) 离港价 USD/TON 离港价 USD/TON 外径 (mm) 壁厚 (mm) 离港价 USD/TON 离港价 USD/TON 外径 (mm) 壁厚 (mm) Q345B Q345B Q235B Q345B 219、245 5.0-11.75 538.18 563.95 462 5.75-11.75 570.39 596.15 273 5.0-11.75 538.18 563.95 462 12.5-13.75 576.83 602.59 273 12.5-13.75 538.18 563.95 457、478 5.75-11.75 576.83 602.59 299 5.5-11.75 551.06 576.83 457、478 12.5-13.75 583.27 609.03 299 12.5-13.75 557.50 583.27 457、478 14.5-17.75 589.71 615.48 325 5.5-11.75 538.18 563.95 508 5.75-11.75 576.83 602.59 325 12.5-13.75 544.62 570.39 508 12.5-13.75 583.27 609.03 355 5.5-11.75 570.39 596.15 508 14.5-17.75 589.71 615.48 355 12.5-13.75 576.83 602.59 529/559/610/630 5.75-11.75 609.03 634.80 377 5.75-11.75 570.39 596.15 529/559/610/630 12.5-13.75 615.48 641.24 377 12.5-13.75 576.83 602.59 529/559/610/630 14.5-17.75 621.92 647.68 406 5.75-11.75 570.39 596.15 660 7.5-11.75 621.92 647.68 406 12.5-13.75 576.83 602.59 660 12.5-13.75 628.36 654.12 406 / / 660 14.5-17.75 634.80 660.56 Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valide during JANUARY 11-17; 4. The above price is only valide during JANUARY 11-17; 4. The above price is only valide during JANUARY 11-17; 4. The above price is only valide during JANUARY 11-17; 4. The above price is only valide during JANUARY 11-17; 4. The above price is only valide during JANUARY 11-17; 4. The above price is only valide during JANUARY 11-17; 4. The above price is only valide during JANUARY 11-17; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,
  • oil casing export,oil casing shipment,oil casing inspection,oilfield project procurement,oil casing delivery
    Supplying oil casing for an overseas drilling project involves more than arranging shipment,Product specifications,connection requirements,inspection records,packing and delivery schedules must align with the purchase order and project requirements,
  • oil casing service life,oil casing integrity management,oil casing corrosion,oil casing wear,oil casing maintenance
    Oil casing must withstand mechanical loads,pressure changes,temperature variations and potentially corrosive well fluids throughout its service life,Its long-term performance depends not only on the casing grade selected at procurement,but also on well design,operating conditions and integrity management,
  • oil casing grades comparison,J55 casing,K55 casing,N80 casing,P110 casing,casing grade selection
    Choosing the right oil casing grade affects load capacity,specification compliance and procurement cost,J55,K55,N80 and P110 are commonly specified under API 5CT,but they are not interchangeable simply because their dimensions are similar,The correct choice depends on the approved casing design,required mechanical properties,connection performance and service conditions,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.