Price List

Hunan Great Steel Pipe Co., Ltd
steel tube provider,coated carbon steel pipe,316 stainless steel pipe

Price List for Small Diameter LSAW Steel Pipe 01-14-2020

Date: 2020-01-14
Price List for Small Diameter LSAW Steel Pipe 01-14-2020 Post time: Jan-14-2020 API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 668 668 674 662 667 662 667 667 Thickness 9.53 636 655 662 642 647 642 647 647 壁厚 (mm) 10 636 623 629 642 647 642 647 647 12 636 623 629 642 647 642 647 647 14 636 623 629 642 647 642 647 647 16 636 636 642 629 634 629 634 634 18 / 636 642 629 634 629 634 634 20 / / 642 629 634 629 634 634 22 / / 642 629 634 629 634 634 24 / / 642 629 634 629 634 634 26 / / / 642 634 629 634 634 28 / / / / 634 629 634 634 30 / / / / 634 629 634 634 32 / / / / 647 642 647 647 34 / / / / / / 647 647 36 / / / / / / 647 647 38 / / / / / / / / 40 / / / / / / / / FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 667 667 673 673 / / / / Thickness 9.53 667 667 667 667 667 712 699 / 壁厚 (mm) 10 647 647 654 654 654 725 725 / 12 647 647 641 641 641 673 725 / 14 647 647 641 641 641 673 725 / 16 634 654 641 641 641 673 718 / 18 634 654 641 641 641 673 718 / 20 634 654 641 641 641 673 718 / 22 634 654 641 641 641 673 718 / 24 634 654 641 641 641 673 718 / 26 634 654 641 641 641 673 718 / 28 621 641 628 628 628 673 718 / 30 621 641 654 654 654 673 718 / 32 634 654 654 654 654 686 725 / 34 634 654 660 660 660 686 725 / 36 634 654 660 660 660 686 725 / 38 634 654 660 660 660 686 725 / 40 / / / / / 686 725 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact info@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact info@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact info@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact info@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact info@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact info@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact info@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact info@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact info@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact info@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact info@hnssd.com; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valide during January11-17 ; 4. The above price is only valide during January11-17 ; 4. The above price is only valide during January11-17 ; 4. The above price is only valide during January11-17 ; 4. The above price is only valide during January11-17 ; 4. The above price is only valide during January11-17 ; 4. The above price is only valide during January11-17 ; 4. The above price is only valide during January11-17 ; 4. The above price is only valide during January11-17 ; 4. The above price is only valide during January11-17 ; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,
  • oil casing export,oil casing shipment,oil casing inspection,oilfield project procurement,oil casing delivery
    Supplying oil casing for an overseas drilling project involves more than arranging shipment,Product specifications,connection requirements,inspection records,packing and delivery schedules must align with the purchase order and project requirements,
  • oil casing service life,oil casing integrity management,oil casing corrosion,oil casing wear,oil casing maintenance
    Oil casing must withstand mechanical loads,pressure changes,temperature variations and potentially corrosive well fluids throughout its service life,Its long-term performance depends not only on the casing grade selected at procurement,but also on well design,operating conditions and integrity management,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.