Production Process of LSAW Steel Pipe LSAW steel pipe is a longitudinally parallel steel pipe. Usually divided into metric welded steel pipe, welded thin-walled pipe, transformer cooling oil pipe and so on. The straight seam welded pipe has a simple production process, high production efficiency, low cost, and rapid development. LSAW steel pipe according to the production process can be divided into high-frequency straight seam steel pipe and submerged arc welded straight seam steel pipe. Submerged arc welded straight seam steel pipes are divided into UOE, RBE, and JCOE steel pipes according to their different forming methods. The following describes the most common high-frequency straight seam steel pipe and submerged arc welded straight seam steel pipe forming process. Striking: After the steel plate used for manufacturing large-diameter submerged-arc welded straight-joint steel pipes enters the production line, full-plate ultrasonic inspection is first performed; Milling edge: Through the edge milling machine, the two edges of the steel plate are double-sided milled to achieve the required plate width, plate edge parallelism and groove shape; Pre-bend: Pre-bending machine for pre-bending the edge so that the edge of the board has a curvature that meets the requirements; Forming: Firstly, half of the pre-bent steel plate is stamped and stamped into a "J" shape on a JCO forming machine. The other half of the steel plate is also bent and pressed into a "C" shape to form an opening. The "O" shape Pre-welding: After the formation of straight seam welded steel pipe joints and continuous welding using gas shielded welding (MAG); Internal welding: Use vertical multi-wire submerged arc welding (up to four wires) to weld inside the straight seam steel pipe; Outer welding: Use vertical multi-wire submerged arc welding to weld outside LSAW steel pipe; Ultrasonic inspection I: 100% inspection of the internal and external welds of the longitudinal welded steel pipe and the base metal on both sides of the weld; X-ray inspection I: 100% X-ray industrial television inspection of the inner and outer welds, using image processing systems to ensure the detection sensitivity; Expanded diameter: The full-length of the submerged-arc welded straight seam steel pipe is expanded to improve the dimensional accuracy of the steel pipe and the distribution of the internal stress of the steel pipe is improved; Hydraulic pressure test: The root diameter of the expanded steel pipe is tested on the hydrostatic testing machine to ensure that the steel pipe meets the required test pressure. The machine has automatic recording and storage functions; Chamfering: After passing the inspection, the steel pipe is processed by the pipe end to reach the required pipe end groove size; Ultrasonic inspection II: Ultrasonic inspection is performed one by one again to check for defects that may occur in straight seam welded steel pipes after diameter expansion and water pressure. X-ray examination II: X-ray industrial television inspection and tube-end weld seam examination of steel tubes after diameter expansion and hydrostatic pressure testing; Tube end magnetic particle inspection: This inspection is performed to find the tube end defects; Anti-corrosion and coating: The qualified steel pipe is anti-corrosion and coating according to the user's requirements. Post time: Jun-09-2022

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,